The duration of this Agreement will be two years from the effective date....
Search Results "Assurances from Contractors"
Commonly Searched Documents
-
EFFECTIVE DATE/TERMINATION DATE
-
§ 35.130(b)(4)(i)
(i) That have the effect of excluding individuals with disabilities from, denying them the benefits of, or otherwise subjecting them to discrimination; or...
-
11B-409.4.6.2 Location
Control panels shall be on a side wall, 12 inches (305 mm) minimum from any adjacent wall....
-
Proceedings of: Workshop on Improving Building Design for Persons with Low Vision
The Project Manager from GSA was Vijay Gupta until his retirement in January 2011. Since then the new Project Manager from GSA has been Bose Thomas....
-
BS8300:2001 Research
BS8300:2001 Research Annex D and E to the BS8300:2001 Standard includes informative charts and tables from the results of research commissioned to obtain information on anthropometry...
-
11B-604.5.1 Side wall
The side wall grab bar shall be 42 inches (1067 mm) long minimum, located 12 inches (305 mm) maximum from the rear wall and extending 54 inches (1372 mm) minimum from the rear wall with...
-
Request for Clarification and Extension of Comment Period
(ACI-NA)), two from airports (San Francisco International and Denver International), three from U.S. carriers (Spirit Airlines, Allegiant Air, LLC, and Virgin America), four from foreign...
- CaviLock CL100 LaviLock
- Somfy Corporation Controls and Integration myLink™ Demo
- Hill-Rom Liko® M220 / M230 Mobile Lift, Pediatric Video
-
Transfer Protocols
WMD to Platform 1 and from Platform 1 to a higher Platform 2 Level transfer from WMD to Platform 1 and from Platform 1 to a lower Platform 2 Participants choose grab bar heights...
-
1630.4(b)
(b) Hiring, upgrading, promotion, award of tenure, demotion, transfer, layoff, termination, right of return from layoff, and rehiring;...
-
Is Prior Knowledge of the Location of the Means of Egress Necessary?
Once notified, people with a speech disability can use any standard means of egress from the building....
-
5.2.3 Transfer Surface Measurement
The transfer surface should be measured from the center-point of each side of the transfer surface....
-
§27.3(a)
(a) This part applies to each recipient of Federal financial assistance from the Department of Transportation and to each program or activity that receives such assistance....
-
§27.5 Primary recipient
Primary recipient means any recipient that is authorized or required to extend Federal financial assistance from the Department to another recipient....
-
§104.4(b)(1)(ii)
(ii) Afford a qualified handicapped person an opportunity to participate in or benefit from the aid, benefit, or service that is not equal to that afforded others;...
-
§104.11(b)(2)
(2) Hiring, upgrading, promotion, award of tenure, demotion, transfer, layoff, termination, right of return from layoff and rehiring;...
-
f-ii
Is the change in level from the floor to the lift surface ramped or beveled? [ADA Standards §§ 4.11.2, 4.5.2] Yes No...
-
§35.130(b)(1)(ii)
(ii) Afford a qualified individual with a disability an opportunity to participate in or benefit from the aid, benefit, or service that is not equal to that afforded others;...
-
E202.1 General (Section-by-Section Analysis)
E202.1 General (Section-by-Section Analysis) This section proposes that ICT is exempt from these requirements to the extent specified by section E202....
-
§1630.4(a)(1)(ii)
(ii) Hiring, upgrading, promotion, award of tenure, demotion, transfer, layoff, termination, right of return from layoff, and rehiring;...
-
11B-203.1 General
Sites, buildings, facilities, and elements are exempt from these requirements to the extent specified by Section 11B-203....
-
BOAT LAUNCH RAMP
[DSA-AC] A sloped surface designed for launching and retrieving trailered boats and other water craft to and from a body of water....