Steinfeld to make a presentation of the project at one of its meetings....
Search Results "Project"
Commonly Searched Documents
-
Standards Development
-
a) History and Objectives
Mizner, the Director of MOD, testified that because Hopper was not familiar with construction practices in San Francisco, she felt that he had significantly underestimated both the projected...
-
James L.E. Terry, A.I.A., Principal Trainer
His architectural project experience includes healthcare, libraries, educational, corporate, municipal, and recreational facilities....
-
Using the ORAR Exceptions [F202.3, Exception 4 and 1016, Exceptions 1, 2, and 3]
In alteration projects, if a condition for exception does not permit full compliance with a specific provision in the technical requirements for ORARs on a portion of an ORAR, then that...
-
§8.3 Qualified individual with handicaps
substantial interference with the safety or enjoyment of others or with his or her own health or safety in the absence of necessary supportive services may be qualified for occupancy in a project...
-
11B-609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
3. Data Overview
Section 3.1 provides an overview of the total number of movie theater auditoriums operating in the United States in 2015, the types of venues they operate in (venue type), the projected...
-
6.1 General
The basis for the determination shall be documented and maintained with the records of the construction or alteration project. Exception 2....
-
11B-609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
11B-609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
404.2.4.3 Recessed Doors and Gates
Maneuvering clearances for forward approach shall be provided when any obstruction within 18 inches (455 mm) of the latch side of a doorway projects more than 8 inches (205 mm) beyond the...
-
§8.27(a)
(a) Owners and managers of multifamily housing projects having accessible units shall adopt suitable means to assure that information regarding the availability of accessible units reaches...
-
1134A.6, Item 1.2
A water closet may project a maximum of 12 inches (305 mm) into the opening provided that a minimum of 36 inches (914 mm) clear space is maintained between the water closet and the shower...
-
Extensions
Extensions are not required in alterations if they project into cross circulation paths. Extensions must be rounded or returned to the walls, floors, or posts....
-
Best Practices in the Design of Toileting and Bathing Facilities for Assisted Transfers
Sanford, Project Director Atlanta Research and Education Foundation Prepared for: US Access Board The products shown in this report are only intended to serve as illustrated examples...
-
Built-Up Curb Ramps
Built-up curb ramps are permitted, but they cannot project in parking spaces, access aisles, or vehicle traffic lanes....
-
4 - Best practices for construction observation
For large projects for where extensive accessible surfaces are required, early checking should be done to suggest needed adjustments to construction techniques....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware. ◼...
-
11B-502.4 Floor or ground surfaces
Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48. ◼ Advisory 11B-502.4 Floor or ground surfaces...
-
D. What tools are needed to conduct a survey and how do you use them?
The following are the standard tools that the Civil Rights Division uses in conducting its surveys under Project Civic Access: a metal measuring tape that is at least 25-feet long...
-
About the Author
James “Scott” Groenier, professional engineer, began working for MTDC as a project leader in 2003....
-
Documenting Use of the Conditions for Exceptions on a Portion of a Trail or Beach Access Route [F204.4.1]
The documentation should be retained with the project records....