Search Results "Project"
- Communicating with People with Disabilities: Accessible Places
- Bradley 12 Gallon Waste Receptacle
-
5. Site Constraints, Technical Infeasibility, and Unusually Expensive Remediation
Technical Infeasibility, and Unusually Expensive Remediation At the discretion of the City, unusually expensive repairs may be addressed in connection with larger, street-related capital projects...
-
Additional Acknowledgements
The Project Team wishes to thank a number of organizations and individuals who have provided input and comment on the creation of this guide, including: Lou Ann Blake, Managing Editor...
-
808.3 Clear Floor Space
within the defined area of raised jury boxes or witness stands and shall be permitted to be located outside these spaces where ramp or platform lift access poses a hazard by restricting or projecting...
-
11B-203.8 Residential facilities
For projects subject to HUD Section 504 Regulations common use areas in buildings without an elevator on upper stories are not required to comply with these regulations provided that the...
-
11B-405.5 Clear width
Handrails may project into the required clear width of the ramp at each side 3½ inches (89 mm) maximum at the handrail height....
-
11B-405.5 Clear width
Handrails may project into the required clear width of the ramp at each side 3½ inches (89 mm) maximum at the handrail height....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
§8.27(a)
(a) Owners and managers of multifamily housing projects having accessible units shall adopt suitable means to assure that information regarding the availability of accessible units reaches...
-
1134A.6, Item 1.2
A water closet may project a maximum of 12 inches (305 mm) into the opening provided that a minimum of 36 inches (914 mm) clear space is maintained between the water closet and the shower...
-
Extensions
Extensions are not required in alterations if they project into cross circulation paths. Extensions must be rounded or returned to the walls, floors, or posts....
-
Best Practices in the Design of Toileting and Bathing Facilities for Assisted Transfers
Sanford, Project Director Atlanta Research and Education Foundation Prepared for: US Access Board The products shown in this report are only intended to serve as illustrated examples...
-
Built-Up Curb Ramps
Built-up curb ramps are permitted, but they cannot project in parking spaces, access aisles, or vehicle traffic lanes....
-
4 - Best practices for construction observation
For large projects for where extensive accessible surfaces are required, early checking should be done to suggest needed adjustments to construction techniques....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware....
-
11B-804.2 Clearance
Clearances are measured from the furthest projecting face of all opposing base cabinets, counter tops, appliances, or walls, excluding hardware. ◼...
-
404.2.4.3 Recessed Doors and Gates
Maneuvering clearances for forward approach shall be provided when any obstruction within 18 inches (455 mm) of the latch side of a doorway projects more than 8 inches (205 mm) beyond the...
-
a) History and Objectives
Mizner, the Director of MOD, testified that because Hopper was not familiar with construction practices in San Francisco, she felt that he had significantly underestimated both the projected...
-
James L.E. Terry, A.I.A., Principal Trainer
His architectural project experience includes healthcare, libraries, educational, corporate, municipal, and recreational facilities....
-
Using the ORAR Exceptions [F202.3, Exception 4 and 1016, Exceptions 1, 2, and 3]
In alteration projects, if a condition for exception does not permit full compliance with a specific provision in the technical requirements for ORARs on a portion of an ORAR, then that...
-
§8.3 Qualified individual with handicaps
substantial interference with the safety or enjoyment of others or with his or her own health or safety in the absence of necessary supportive services may be qualified for occupancy in a project...
-
11B-609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
