3 - Best practices for pre - construction meetings Pre - construction meetings provide another commonly used technique to communicate the required needs of the project....
Search Results "Project"
-
3 - Best practices for pre - construction meetings
-
68.10(16) Issue
In the case of a state-funded or other public works project, it is the time at which plans or specifications are publicly posted for bids, after such plans or specifications have been sealed...
-
11B-602.9 Pedestrian protection
When used, wing walls or barriers shall project horizontally at least as far as the drinking fountain and to within 6 inches (152 mm) vertically from the floor or ground surface....
-
Multiple Chemical Sensitivities and Electromagnetic Sensitivities
The Board also is sponsoring a project on indoor environmental quality....
-
Narrative description. (Section-by-Section Analysis)
The descriptions are narrated and recorded onto an audiotape or disk that can be synchronized with the film as it is projected....
-
DOJ Compliance Highlights
Comply with all 2010 ADA Standards for Accessible Design for new construction and remodeling projects....
-
F247.1 General
requirement for trails in 1017 are required to comply with the technical requirements for trails in 1017. 8 The Federal Trail Data Standards are available at: http://www.fgdc.gov/standards/projects...
-
4.2.8. Zero Growth After Five Years
The projected growth rate of the number of auditoriums within each venue type is discussed in Section 3.1.3. ...
-
Exception 9
In alteration projects involving buildings and facilities previously approved and built without elevators, areas above and below the ground floor are subject to the 20-percent disproportionality...
- HERL's Computer Assisted Rehabilitation ENvironment (CAREN)
- Bradley Low Capacity Towel Dispenser / 5.3 Gallon Waste Receptacle 2251
- Bradley Medium Capacity Towel Dispenser 2441
- Bradley Medium Capacity Towel Dispenser 244
- Bradley Contemporary Series Napkin Disposal 4737
- Bradley 9.2 Gallon Waste Receptacle 3157
- Bradley 9.2 Gallon Waste Receptacle 315
-
FAQ: What are "Corada WorkGroups?"
This is a new and exciting feature within the Corada WorkSpace that allows users to create "WorkGroups" to use individually; or, users can invite staff, project team members, colleagues,...
-
3. Discussion of Comments on Related Fair Housing Issues Compliance Deadline
Other commenters stated that it is unreasonable to impose additional requirements on a substantially completed project that unexpectedly has been delayed for occupancy beyond the March 13...
- Human Engineering Research Laboratories (HERL) PneuMobility
-
Architect
It also has a top jamb mounted configuration that can maintain the 78" aff for Barrier Removal projects with 6'-8" doors....
-
Handrail Extensions
ADAAG does not require handrails on sloped surfaces that have a rise of less than 6 inches or a projection less than 72 inches, or a slope of 1:20 (5%) or less....
-
404.2.4.3 Recessed Doors and Gates
Maneuvering clearances for forward approach shall be provided when any obstruction within 18 inches (455 mm) of the latch side of a doorway projects more than 8 inches (205 mm) beyond the...
-
502.4 Floor or Ground Surfaces
Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48....
-
Will CALGreen be amended to require that some parking spaces are designed so that they can comply with Chapter 11B requirements when converted to EV charging spaces (i.e. slope, vertical clearance, path of travel)?
While the California Green Code nonresidential mandatory measures require projects to identify an EV space, provide an electrical raceway to the service panel, and provide adequate capacity...