Unusual characteristics include sites located in a state or federally designated floodplain or coastal high-hazard areas and sites subject to other similar requirements of law or...
Search Results "CSI: Construction Specification Institute"
-
11B-233.3.1.2.6.4 Test number three, unusual characteristics test
-
11B-233.3.1.2.6.3 Test number two, site analysis test
For a site having multiple buildings, or a site with a single building with multiple entrances, it is not required to provide a building entrance on an accessible route to all ground...
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
1011.1 General
This section contains the technical requirements for outdoor constructed features provided within camping facilities, picnic facilities, viewing areas, and trailheads or on trails....
- Landscape Forms Inc. Presidio Trash Receptacle
-
Full-Powered Automatic Doors and Gates [§404.3]
Full-Powered Automatic Doors and Gates [§404.3] Full-powered automatic doors and gates are often found in grocery and retail stores, hotels, and airports to ease passage with...
- Landscape Forms Inc. Petoskey Trash Receptacle
-
Designing Sidewalks and Trails for Access
Accessibility guidelines and practices, as well as construction and maintenance techniques, have evolved since these reports were published....
-
Links
Accessibility Checklist http://www.fs.fed.us/recreation/programs/accessibility/ Forest Service Recreation Opportunities http://www.fs.fed.us/recreation/ Forest Service National Trail Specifications...
-
Conditions for Exceptions [1019]
space Alterations only Tent pads and tent platforms Any specific provision New construction or alterations Camp shelters Any specific provision...
- Pilot Rock CN-R/R Round Receptacle Perforated Steel
- Pilot Rock CN-R/D Trash Receptacle
-
10.4.1(1)
(1) Elements such as ramps, elevators or other vertical circulation devices, ticketing areas, security checkpoints, or passenger waiting areas shall be placed to minimize the...
-
1.1.4 Walk cross slope
1.1.4 Walk cross slope. Measure for overall cross slope (the direction perpendicular to the running slope) by establishing elevations at the outside edges of the walking surface at...
-
Elements Within Camping Units With Mobility Features [F244.2.3]
At least one of each type of element provided within camping units with mobility features, including outdoor constructed features, parking spaces for RVs, parking spaces for vehicles other...
-
Benches
If a condition for exception in an alteration project at an existing site prohibits full compliance with a specific requirement for clear floor or ground space (surface, slope, size, or...
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
-
1. My business does not need to be compliant because the building is old and therefore is grandfathered.
"Grandfathering" is the notion that the Americans with Disabilities Act (ADA) and state law access requirements do not apply to buildings constructed prior to the effective date of these...
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
- Selecting a Kitchen Faucet: Finish, Valving and Construction
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
In the new construction of a new facility, all accessible rooms and spaces are required to be connected by an accessible route and all toilet facilities, drinking fountains, public telephones...
-
§ 37.42(a)
requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry into final design or that begin construction...
-
§ 37.42(a)
requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry into final design or that begin construction...