Where provided, key surfaces outside active areas of the display screen shall be raised above surrounding surfaces....
Search Results "Check Writing Surface"
-
407.3.1 Identification
-
STORY
[DSA-AC] That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
11B-605.5.4 Toe Clearance
Partition components at toe clearances shall be smooth without sharp edges or abrasive surfaces....
-
GUARD OR GUARDRAIL
A building component or a system of building components located at or near the open sides of elevated walking surfaces that minimizes the possibility of a fall from the walking surface to...
-
406.2 Counter Slope
Counter slopes of adjoining gutters and road surfaces immediately adjacent to the curb ramp shall not be steeper than 1:20....
-
Height: ADA Standard Section 1005.2.1
At least 25 percent of the railings, guards, or handrails shall be 34 inches (865 mm) maximum above the ground or deck surface....
-
Clear Width: ADA Standard Section 403.5.1
Section 403.5.1 covers the current ADA Standards for the clear width of walking surfaces that are part of an accessible route.
-
4.34.6.4(1)
(1) The counter shall be mounted at a maximum height of 34 in (865 mm) above the floor, measured from the floor to the top of the counter surface, or shall be adjustable or replaceable as...
-
Finish and Contrast: ADA Standard Section 703.7.1
Additional factors affecting the ease with which the text can be distinguished from its background include shadows cast by lighting sources, surface glare, and the uniformity of the text...
-
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
-
Illumination Levels (Reserved) [4.30.8]
A level from 10 to 30 footcandles is recommended uniformly over the sign surface....
-
Transfer Height
Transfer Height Ride seats designed for transfer must be between 14 and 24 inches above the load and unload area surface....
-
20. DESIGN AND CONSTRUCTION STANDARDS
The ADA consultant shall notify HWI in writing of any elements in the plans and designs that the ADA consultant deems non-compliant with the ADA Standards....
-
Willoughby Industries WAW-2322-DMF AquaWave® Two Station Solid Surface Lavatory System for Deck Mounted Faucets
Requires the Premium User plan or above. (Login or upgrade your account!)
-
5.4.1.1 Transfer Support Location Recommendation for Stretchers
5.4.1.1 Transfer Support Location Recommendation for Stretchers For Stretchers, the transfer surface is oriented along the long side of the surface....
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-1009.5.4 Transfer steps
The surface of the bottom tread shall extend to a water depth of 18 inches (457 mm) minimum below the stationary water level. Advisory 11B-1009.5.4 Transfer steps....
-
Test Procedures
Accessibility and Durability Measures The beach path surfaces were periodically measured with a rotational penetrometer....
-
GUARD OR GUARDRAIL
A building component or a system of building components located at or near the open sides of elevated walking surfaces that minimizes the possibility of a fall from the walking surface to...
-
5.1.8 Slope
The slope of the surface of the clear ground space shall not be steeper than 1:48 in any direction....
-
CURB RAMP
A sloping prepared surface, intended for pedestrian traffic, which provides access between a walk or sidewalk and a surface located above or below an adjacent curb face....
-
4. BUILD AN EMERGENCY NETWORK
Long-term Recovery Groups (LTRG) Community Organizations Active in Disaster (COAD) Community Emergency Response Teams (CERT) New York Rising Communities (check...
-
Issue 4: Wrong pole! …Wrong message!
The wiring and device output needs to be checked after modification to assure that the APS is signaling the correct crossing phase. ...