The descriptions are narrated and recorded onto an audiotape or disk that can be synchronized with the film as it is projected....
Search Results "Multifamily Housing Project (HUD 504)"
Commonly Searched Documents
-
Narrative description. (Section-by-Section Analysis)
-
DOJ Compliance Highlights
Comply with all 2010 ADA Standards for Accessible Design for new construction and remodeling projects....
-
F247.1 General
requirement for trails in 1017 are required to comply with the technical requirements for trails in 1017. 8 The Federal Trail Data Standards are available at: http://www.fgdc.gov/standards/projects...
-
4.2.8. Zero Growth After Five Years
The projected growth rate of the number of auditoriums within each venue type is discussed in Section 3.1.3. ...
-
Exception 9
In alteration projects involving buildings and facilities previously approved and built without elevators, areas above and below the ground floor are subject to the 20-percent disproportionality...
-
Appendix 4 – References
Project report on the field testing of the Australian standard 1428-1977 part 1—Recommended amendments and index to part 2 detailed reports. ...
- Rebuilding Together Philadelphia - Philadelphia, PA
-
§35.190 Designated Agencies
At least 26 agencies currently administer programs of Federal financial assistance that are subject to the nondiscrimination requirements of section 504 as well as other civil rights statutes...
-
11 [§ 4.7.6]
Built-up curb ramps cannot project into the path of cars....
-
11B-602.9 Pedestrian protection
When used, wing walls or barriers shall project horizontally at least as far as the drinking fountain and to within 6 inches (152 mm) vertically from the floor or ground surface....
-
4.10.3 Hall Call Buttons
Objects mounted beneath hall call buttons shall not project into the elevator lobby more than 4 in (100 mm)....
-
4.10.3 HALL CALL BUTTONS
Objects mounted beneath hall call buttons shall not project into the elevator lobby more than 4 in (100 mm)....
-
National Trail Surfaces Study Final Report
Access Board 1331 F Street, NW, Suite 1000 Washington, DC 20004-1111 (202) 272-0080 (Voice) (202) 272-0082 (TTY) www.access-board.gov Project Team Nicole Montembeault, Principal...
-
3 - Best practices for pre - construction meetings
3 - Best practices for pre - construction meetings Pre - construction meetings provide another commonly used technique to communicate the required needs of the project....
-
68.10(16) Issue
In the case of a state-funded or other public works project, it is the time at which plans or specifications are publicly posted for bids, after such plans or specifications have been sealed...
-
11B-602.9 Pedestrian protection
When used, wing walls or barriers shall project horizontally at least as far as the drinking fountain and to within 6 inches (152 mm) vertically from the floor or ground surface....
-
ACCESSIBLE DWELLING UNITS
Requires the Accessibility Specialist plan or above. (Login or upgrade your account!)
- Bradley 9.2 Gallon Waste Receptacle 315
- Bradley Contemporary Series Napkin Disposal 4737
- Bradley Low Capacity Towel Dispenser / 5.3 Gallon Waste Receptacle 2251
- Bradley Medium Capacity Towel Dispenser 2441
- Bradley Medium Capacity Towel Dispenser 244
- Bradley 9.2 Gallon Waste Receptacle 3157
- Yale 1800 Series Flatbar Exit Device