Another study researched the effect of cross-slopes on the mobility of manual wheelchair users and also reported the majority of their subjects having spinal cord injury followed by multiple...
Search Results "Slope Meter"
Commonly Searched Documents
-
Study limitations
-
Program Accessibility
For example, if there is not enough space to install a ramp with a slope no steeper than 1:12, a public entity may install a ramp with a slightly steeper slope....
-
Installation
Sites installed with EWF were found to have the highest SDS within the first year of installation including deficiencies with excessive running slope, cross slope and change in level. ...
-
Overview
original scope of work for this research project involved a longitudinal study that would examine the influence of five key variables: hydrology, climate, soil condition, grade and cross slope...
-
Accessibility - Flatness and Lippage
Concrete paving slabs: Laying pattern .. ..90 degree herringbone ..Stack bond or runningbond Slope in direction of travel All segmental concrete paving products...
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Data Collection Procedures
Potential causes for variation might be running and cross slope, a difference in drainage and/or adjacent runoff, and sun vs. shade location of reading locations....
-
Required Means of Egress [IBC §1007.1 (2003), §1003.2.13 (2000)]
The IBC (2003) permits one accessible means of egress from: wheelchair seating in assembly areas with sloped floors where the common path of travel meets aisle requirements for...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ...
-
Basic Principles
A city government may offer a program that allows people with disabilities to park for free at accessible metered parking spaces, but the ADA does not require cities to provide such programs...
-
FOREWORD
Some examples of findings include: Sweep Width-The 85th percentile inline skater had a 1.5-meter (m) (4.9-foot (ft) sweep width, wider than the AASHTO recommended width for bike lanes...
- Envirobond Organic-Lock™ Surface Stabilizer
-
FIGURE INDEX
Gates in Series Figure 405.7 Ramp Landings Figure 405.9.1 Extended Floor or Ground Surface Edge Protection Figure 405.9.2 Curb or Barrier Edge Protection Figure 406.2 Counter Slope...
-
Swimming pools, wading pools, saunas, and steam rooms. (Section-by-Section Analysis)
Most commenters stated that installing a sloped entry in an existing wading pool is not likely to be feasible....
- Garaventa Evacu-Trac CD7 Evacuation Chair
-
810 Transportation Facilities
The Board has explicitly specified that rail platforms shall slope no more than 1:48 in any direction, consistent with cross slope provisions for walking surfaces in section 403....
-
G. Completing the Survey and Checklist
The accessible route is a continuous unobstructed pedestrian path without steps or steep slopes that connects all accessible site and building features and spaces together....
-
Installation of Test Surfaces
All roots, stones, and vegetation were removed. 2) Place a diversion along the slope above the test area to assure no direct site drainage into the surfaced area. 3) Cover entire subgrade...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ◼...
-
Roughness Calculation
The slopes of the linear trend lines show that as surface roughness increased, average RMS accelerations consequently increased....
-
240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
Feature 2 - Routes to the Building Entrance
Abrupt level changes, steps, or steeply sloped sidewalks cannot be part of an accessible route. Where ramps are used, they cannot be steeper than 1:12 (8.33% incline)....
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....