A boat launch ramp is a sloped surface designed for launching and retrieving trailered boats and other watercraft to and from a body of water....
Search Results "Cross Slope"
Commonly Searched Documents
-
Boarding Piers at Boat Launch Ramps
-
DSA IR 11B-3: DETECTABLE WARNINGS AT CURB RAMPS (with revisions issued through Jan. 2011)
(6.7% slope).”...
- UMEA Waste Receptacle
-
11B-1009.2.2 Seat location
The deck surface between the centerline of the seat and the pool edge shall have a slope not steeper than 1:48. FIGURE 11B-1009.2.2 POOL LIFT SEAT LOCATION...
-
R409.10.3 Bottom Extension at Stairways
At the bottom of a stair flight, handrails shall extend at the slope of the stair flight for a horizontal distance at least equal to one tread depth beyond the last riser nosing....
-
§ 38.23(c)(3) Ramp threshold
Changes in level between 1/4 inch and 1/2 inch shall be beveled with a slope no greater than 1:2....
-
A trailhead
For purposes of FSTAG, trailheads are not: Junctions between trails where there is no other access Intersections where a trail crosses a road or where users have developed...
-
11B-246.2 Camping facilities
at least two campsites and one additional campsite for each 100 campsites or fraction thereof, shall be accessed by and connected to sanitary facilities by travel routes with a maximum slope...
-
Ramps
For each elevated ramp run: 12-inch (305 mm) maximum rise 1:12 maximum slope 36-inch (915 mm) minimum clear width ...
-
4.1.1 General
In alterations, where a condition for exception in section 1.1 prohibits full compliance with a specific requirement for clear floor or ground space surface slope, size, or location, the...
-
11B-246.2 Camping facilities
at least two campsites and one additional campsite for each 100 campsites or fraction thereof, shall be accessed by and connected to sanitary facilities by travel routes with a maximum slope...
-
11B-246.2 Camping facilities
at least two campsites and one additional campsite for each 100 campsites or fraction thereof, shall be accessed by and connected to sanitary facilities by travel routes with a maximum slope...
-
2.3
lines of sight comparable to those for members of the general public, (b) including wheelchair spaces as an integral part of the fixed seating plan, (c) providing the appropriate depth for cross...
-
Issue 6: Pre-timed signals (an APS is more than a pushbutton)
vibrotactile WALK; the tactile arrow for wayfinding; tactile mapping; if provided, and messages and actions available with an extended button push, such as audible beaconing or an extended crossing...
- Willoughby Industries ASHS-1013-06-15-HC Ligature-Resistant 15" wide Lavatory
- Sargent 8200 Mortise Lock with BHL Trim
- Salsbury Industries Designer Wood Locker Single Tier 1 Wide
- Salsbury Industries Designer Wood Locker Single Tier 3 Wide
-
505.10.3 Bottom Extension at Stairs
At the bottom of a stair flight, handrails shall extend at the slope of the stair flight for a horizontal distance at least equal to one tread depth beyond the last riser nosing....
-
T302.4 Surface Discontinuities
Surface discontinuities shall be ½ inch (13 mm) high maximum and shall be beveled with a slope not steeper than 1:2. EXCEPTIONS: 1....
-
Bus boarding and alighting areas
be in compliance with the ADA-ABA Guidelines (Section 810.2), which address surfaces (sturdy), dimensions (96" long x 60" wide); connection to sidewalks, streets and pedestrian paths; slope...
-
1009.2.2 Seat Location
The deck surface between the centerline of the seat and the pool edge shall have a slope not steeper than 1:48. Figure 1009.2.2 Pool Lift Seat Location...
-
Why is a top landing required at curb ramps if side flares are provided?
A landing at least 36” long at the top of curb ramps provides room to approach or exit ramps and turn without encountering compound slopes of flared sides....
-
Legislation
The current ADAAG guidelines (Table 1) provide a description of the suggested width and slope, but do not provide guidance on pathway roughness except that obstacles should be no more than...