The rim must be "elongated," but a minimum horizontal projection is not specified. Recommendation: Specifying a urinal rim with the maximum projection available is recommended....
Search Results "Anthropometry of Wheeled Mobility Project"
Commonly Searched Documents
-
Height [4.18.2]
-
304 Turning Space
They argued that wheelchairs and other mobility devices are becoming larger and that more individuals with disabilities are using electric three and four-wheeled scooters which cannot utilize...
-
1016.4 Passing Spaces
., as flat as possible) so that all the wheels of a mobility device touch the ground when turning into and out of the passing space....
-
ASME A18.1 Safety Standard [§410.1]
Lifts without platforms, including stairway chairlifts, are not permitted by the ADA Standards except at swimming pools and spas because they require transfer from wheeled mobility aids....
-
3. FIELD VERIFICATION
FIELD VERIFICATION: DSA may review the code compliance of the path of travel during the course of a project. 3.1 Plan Review: DSA may verify compliance of path of travel elements presented...
-
Overview
Overview: The subcommittee recognized that to get the best accessibility, equipment would need redesign to accommodate persons seated in wheeled mobility devices for the exam....
-
The Limits of Utilizing a Cost-Benefit Analysis
injuries due to being dropped, as well as skin shear and shoulder injuries can occur when the transfer surface cannot be adjusted low enough to accommodate a straight transfer for individual wheeled...
-
10.3.1(13)
the route surface shall be level and flush with the rail top at the outer edge and between rails, except for a maximum 2‒1/2 inch gap on the inner edge of each rail to permit passage of wheel...
-
Surfaces for Outdoor Recreation Access Routes
(Bicycle tires are similar to the large rear wheels of a wheelchair.)...
-
§8.23(a) Substantial alteration
If alterations are undertaken to a project (including a public housing project as required by §8.25(a)(2)) that has 15 or more units and the cost of the alterations is 75 percent or more...
-
68.102(b) Estimated cost of construction
(b) For purposes of registration, the estimated cost of construction for the project shall be based on the pedestrian elements only....
-
Clear Floor Space: ADA Standard Section 808.3
within the defined area of raised jury boxes or witness stands and shall be permitted to be located outside these spaces where ramp or platform lift access poses a hazard by restricting or projecting...
- How to: inflate the tires on the GRIT Freedom Chair
-
1. MOVING (MOBILITY / PHYSICAL / MOTOR – LIMITED OR NO ABILITY GRAB, GRIP, LIFT, HOLD, ETC)
1.1. Uses Wheelchair Scooter Walker Cane Braces Prosthesis Service Animal - Overnight stay w/...
-
R302.7.4 Flangeway Gaps
Flangeway gaps are necessary to allow the passage of train wheel flanges....
-
Registered Accessibility Specialist (RAS) Bulletin RAS 2012-02 Alterations Affecting Primary Function Areas
To facilitate the identification of construction projects that are funded by the tenant, the Department has modified the Project Registration Form (PRF) to include the question: "Are the...
-
5. Significance and Use
information will be a useful input to the pathway and sidewalk management systems maintained by municipal agencies. 5.2.2 When profiles are measured simultaneously for multiple traveled wheel...
-
Baby Strollers
Baby Strollers This user group includes a variety of wheeled devices pushed by adults to transport babies or small children....
-
Alterations to Existing Facilities
The phrase “within the scope of the project” is intended to focus on whether the alteration project presents an opportunity to design the altered element, space, or facility in an accessible...
-
11B-808.3 Clear floor space
within the defined area of raised jury boxes or witness stands and shall be permitted to be located outside these spaces where ramp or platform lift access poses a hazard by restricting or projecting...
-
F248.1.2 Beach Nourishment
Beach access routes shall be provided in a number complying with F248.2 where the entity that administers or manages a beach undertakes a beach nourishment project....
-
F248.1.2 Beach Nourishment
Beach access routes shall be provided in a number complying with F248.2 where the entity that administers or manages a beach undertakes a beach nourishment project....
-
ADDENDUM TO PHASE I FINAL REPORT: Points of Clarification
mobility device with or without a transfer board). ...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....