Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48....
Search Results "Project Management"
-
502.4 Floor or Ground Surfaces
-
Will CALGreen be amended to require that some parking spaces are designed so that they can comply with Chapter 11B requirements when converted to EV charging spaces (i.e. slope, vertical clearance, path of travel)?
While the California Green Code nonresidential mandatory measures require projects to identify an EV space, provide an electrical raceway to the service panel, and provide adequate capacity...
-
404.2.4.3 Recessed Doors and Gates
Maneuvering clearances for forward approach shall be provided when any obstruction within 18 inches (455 mm) of the latch side of a doorway projects more than 8 inches (205 mm) beyond the...
-
Stacks [8.5]
Stacks [8.5] Elements fixed to stacks, such as ladders, cannot reduce the minimum passage width nor should signs or other elements between 27 to 80 inches above the floor project more...
-
Attachment B
the Consent Decree: Description of Element: Location of Element: ____________________ Date __________________________________ Signature of Independent Licensed Architect Project...
-
11B-602.9 Pedestrian protection
When used, wing walls or barriers shall project horizontally at least as far as the drinking fountain and to within 6 inches (152 mm) vertically from the floor or ground surface....
- Bradley Roll-Towel Dispenser / 10.5 Gallon Waste Receptacle 2277
- Bradley High Capacity Towel Dispenser / 12 Gallon Waste 237
- Bradley Low Capacity Towel Dispenser / 1.25 Gallon Waste Receptacle 229
- Bradley Low Capacity Towel Dispenser 2442
- Bradley High Capacity Towel Dispenser / 8.2 Gallon Waste 238
-
Kurt Knight: Development of VA Standards
Governments – there’s always the major-project funding; there’s minor-project funding; there’s maintenance funding and never the twain shall meet....
- Perkins School for the Blind - Bus Stop Challenge
-
E102.6 ISO (Section-by-Section Analysis)
E102.6 ISO (Section-by-Section Analysis) ISO 14289-1 (2012), Document management applications — Electronic document file format enhancement for accessibility — Part 1: Use of ISO 32000...
-
SUMMARY
Also included is a Personal Emergency Evacuation Planning Checklist that building services managers and people with disabilities can use to design a personalized evacuation plan....
-
Staff Training
Venues of all sizes are strongly encouraged to educate venue managers, box office staff, individuals answering phones or responding to Internet inquiries, and any other staff involved in...
- Omnia Industries Inc. Interior Modern Lever Latchset with Square Rose - Stainless Steel No.25S
- Bradley High Capacity Towel Dispenser 247
- Bradley Low Capacity Towel Dispenser / 2 Gallon Waste Receptacle 2291
- Rehabilitation Engineering Research Center on Accessible Public Transportation
-
11B-809.10.6.1 Size
A water closet shall be permitted to project 12 inches (305 mm) maximum into the opening provided that 36 inches (914 mm) minimum clear space is maintained between the water closet and the...
- Bobrick Accessibility Video -- Mounting Height and Reach Ranges
-
502.4 Floor or Ground Surfaces
Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48....
-
502.4 Floor or Ground Surfaces
Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48....