This report is available through: Access Board (USATBCB) 1331 F Street, NW, Suite 1000 Washington, DC 800.872.2253 ph, 202.272.5447 fax and Beneficial Designs, Inc. 5858 Empire Grade...
Search Results "Grade Break"
Commonly Searched Documents
-
References
-
TEST NO. 1 – INDIVIDUAL BUILDING TEST
The slopes of the planned finished grade measured between the entrance and all vehicular or pedestrian arrival points within 50 feet (15 240 mm) of the planned entrance also exceed 15 percent...
-
TEST NO. 1 – INDIVIDUAL BUILDING TEST
between the planned entrance and all vehicular or pedestrian arrival points within 50 feet (15 240 mm) of the planned entrance exceed 15 percent; and The slopes of the planned finished grade...
-
11B-233.3.1.2.6.2 Test number one, individual building test
The slopes of the planned finished grade measured between the entrance and all vehicular or pedestrian arrival points within 50 feet (15,240 mm) of the planned entrance also exceed 15 percent...
- Cal-Royal 900 Series Hydraulic Door Closers
- Hager Companies 3796 Interconnected Lockset
- DORMA C300 Series Locks Door Hardware
-
Notes
Preventive Services Task Force gives colonoscopy screening to detect colorectal cancers a Grade A (service recommended: high certainty that the net benefit of the service is substantial)...
- DORMA C500 Series Lockset
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
- Accessible Dispatch Taxi Service App
- Rockland Independent Living Center (RILC) - New City, NY
- Independent Lifestyles, Inc. (ILICIL) - Sauk Rapids, MN
- Allegion Falcon SC60 Series Surface Mounted Door Closer
- Stanley Hardware RP9402 Door Closer
- DORMA 8600 Series Door Closer
- Cal-Royal CR441 Series Hydraulic Door Closers
- DORMA J300 Series Locks
- SafetySign Reserved Parking Sign with Universal Access Symbol
- SafetySign Van Accessible Parking Sign (White Text and Border)
- SafetySign Van Accessible Parking Signage (Green Text and Border)
-
ADA Transition Plan Working Group and Review Team
Shortly after those meetings, a smaller, break-out team (referred to as the “ADA transition plan Review Team,” hereinafter, “Review Team”) was created by the Working Group and charged with...
-
Best Practice Recommendations for Layout Planning
If accessible restrooms are not on the same floor, increase break times between sessions....
-
Attachment A
Description Initial Scope of Project Required Accessibility Work 6.3D New on-grade parking lot with PV system as part of larger project or as a separate concurrent...