Constructed of steel plate finished in textured bronze paint, RETTO features a generous access opening, a locking front door and an internal galvanized liner....
Search Results "Commencement of Construction"
- Magnuson Group RETTO Outdoor Waste Receptacle
-
Section 4. Application of the Guidelines
The design specifications (guidelines) presented in Section 5 apply to new construction of "covered multifamily dwellings", as defined in Section 2....
-
§ 36.401(d)(2)(ii)
(ii) A terminal, depot, or other station used for specified public transportation, or an airport passenger terminal. In such a facility, any area housing passenger services,...
-
Benches
Ensure that all benches provided along Forest Service trails or beach access routes or at Forest Service recreation sites (other than those inside a building or in an amphitheater)...
- Landscape Forms Inc. Presidio Trash Receptacle
-
A4.17.3 Size and Arrangement
six or more toilet stalls are provided, it is therefore required that a 36 in (915 mm) wide stall with parallel grab bars be provided in addition to the standard stall required in new construction...
- Landscape Forms Inc. Wellspring Trash Receptacle
-
Effect on Removal of Barriers in Existing Facilities: ADA Standard Section 101.2
Section 101.2 of the ADA Standards covers the effects of the removal of barriers in existing facilities.
- Pilot Rock CN-R/R Round Receptacle Perforated Steel
- Pilot Rock CN-R/D Trash Receptacle
- Pilot Rock BPR2 Bear Resistant Trash and Recycling Receptacle
- Landscape Forms Inc. Chase Park Trash Receptacle
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
- Pilot Rock BPR1 Bear Resistant Trash Receptacle
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
- Bosch 3 Point Self Leveling Alignment Laser Level GPL 3 S
-
Flange way gap
For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
In the new construction of a new facility, all accessible rooms and spaces are required to be connected by an accessible route and all toilet facilities, drinking fountains, public telephones...
-
Calculation of Percentages: ADA Standard Section 104.2
Section 104.2 of the ADA Standards covers the most current information on the calculation of percentages in the ADA Standards.
-
1011.1 General
This section contains the technical requirements for outdoor constructed features provided within camping facilities, picnic facilities, viewing areas, and trailheads or on trails....
-
Overview
Newly constructed and altered pools must meet these requirements. Public entities and public accommodations also have obligations with respect to existing pools....
- Magnuson Group UMEA Waste Receptacles
-
United States of America v. Quiktrip Corporation - Consent Decree
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEBRASKA Omaha Division THE UNITED STATES OF AMERICA, Plaintiff, v. QUIKTRIP...