benches, clerks' stations, bailiffs' stations, deputy clerks' stations, and court reporters' stations shall not be required to provide vertical access provided that the required clear floor...
Search Results "Floor Slope"
Commonly Searched Documents
-
11B-206.2.4 Spaces and elements
-
11B-206.2.4 Spaces and elements
benches, clerks' stations, bailiffs' stations, deputy clerks' stations, and court reporters' stations shall not be required to provide vertical access provided that the required clear floor...
- EVAC+CHAIR® 300H (MK-4) Evacuation Chair
- EVAC+CHAIR® 600H Stair Evacuation Chair with Lift Handles
- Detecto FHD Series Stationary Wheelchair Scale
- AJW Architectural Products UG120-Railing UG120X-Y108 108" Exposed Flange, 1.25" Diameter, Peened Grip - Configuration Y
- Smith Carrel Hi-Lo Study Carrel - "The Original"
- Kessel Design Linearis Super60 Trench Drain
- American Standard Right Width 1.28-1.6 gpf FloWise Right Height Elongated Flushometer Toilet
- TownSteel ED1400F Grade 1 Mortise Fire Device
- Neo-Metro Commercial Contour Urinal 8944 Series
- AJW Architectural Products UG130-Railing UG130X-Y108 108" Exposed Flange, 1.5" Diameter Grab Bar, Peened Grip - Configuration Y
- AJW Architectural Products UG3-Railing UG3X-Y108 108" Concealed Snap Flange, 1.5" Diameter, Peened Grip - Configuration Y
- Lift-U® LU12 Step/Platform Onboard Lift
-
Elevator requirement to new dining area on the mezzanine of an existing facility
The two keys to the answer are that no elevator would be required in the building in new construction because no floor in the building has more than 3000 square feet of floor area, but no...
- Panda US-51 All Aluminum ULTRA Folding Door System
- Make A Hero - 'The Movement' - Adaptive Sports Film
- Tile Tech Pavers® IPE Deck Tiles
-
Fur out the wall
Don't cut the concrete or flooring or move plumbing. Just need to make sure all other clearances, (42" from center line to adjacent wall/fixture is clear, etc.) ...
-
California: Toilet Grab Bars - Uneven height allowed?
Grab bars shall be installed in any manner that provides a gripping surface at the specified locations and that does not obstruct the required clear floor space....
-
11B-202.4 Path of travel requirements in alterations, additions and structural repairs
Office buildings and passenger vehicle service stations of three stories or more and 3,000 or more square feet (279 m2) per floor. 2. ...
-
11B-202.4 Path of travel requirements in alterations, additions and structural repairs
The types of buildings and facilities are: Office buildings and passenger vehicle service stations of three stories or more and 3,000 or more square feet (279 m2) per floor....
-
A. Background
access at street crossings for pedestrians who are blind or have low vision, wheelchair access to on-street parking, and constraints posed by space limitations, roadway design practices, slope...
-
Preliminary Guidelines for SEWF Installation
Provide a minimum of 1% slope for all substrates for drainage. Ambient air temperature should be 40°F (4°C) or greater and rising when SEWF is applied....
