On each anniversary of his injury, April 14, he gave a speech about disability on the Senate floor....
Search Results "Floor Slope"
Commonly Searched Documents
-
Building Support for S. 933
- Willoughby Industries WAW-2333 AquaWave® Three Station Solid Surface Lavatory System
- Willoughby Industries WAW-2322 AquaWave® Two Station Solid Surface Lavatory System
- Caroma® USA Somerton Smart 270 Easy Height Elongated Toilet
- Caroma® USA Invisi Series II Cube Wall Hung Water Closet
- Caroma® USA Sydney Low Profile 270 Easy Height Round Front Plus Toilet
- Caroma® USA Sydney Low Profile 270 Easy Height Elongated Toilet
- Caroma® USA Invisi Series II Walvit Wall Hung Elongated Water Closet
- Panda S.81 All Aluminum Multi-Slide Door System
-
Comments
., Amtrak and a commuter railroad) and that, in many cases, the floor heights of the various railroads' equipment are different....
-
240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
Feature 2 - Routes to the Building Entrance
Abrupt level changes, steps, or steeply sloped sidewalks cannot be part of an accessible route. Where ramps are used, they cannot be steeper than 1:12 (8.33% incline)....
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Issue: Curb Ramps
Likewise, when new sidewalks or walkways are built or altered, they must contain curb ramps or sloped areas wherever they intersect with streets or roads....
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
F240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
1. Start with Comprehensive Planning and Site Selection
A site survey, even for sites considered “flat” or without substantial change in elevation, should be conducted to design for a continuous accessible route, with compliant cross slope and...
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
General Exceptions in FSTAG
Access Board for identifying when extreme environmental barriers may exempt an entire trail from technical accessibility requirements: A combination of running slope and cross slope...
-
Roughness Calculation
The slopes of the linear trend lines show that as surface roughness increased, average RMS accelerations consequently increased....