Assess During the Planning, Installation and Maintenance Phases Once the playground surface is installed, an on-site inspection of the surface system should be conducted along the accessible...
Search Results "Maintenance Cost"
Commonly Searched Documents
-
4. Assess During the Planning, Installation and Maintenance Phases
-
VI. Regulatory Process Matters (SBREFA, Regulatory Flexibility Act, Executive Orders, Benefits and Costs)
Regulatory Process Matters (SBREFA, Regulatory Flexibility Act, Executive Orders, Benefits and Costs) Since this proposal is an ANPRM, the Department is not required to conduct certain...
-
68.54. Review and Inspection of Buildings and Facilities with an Estimated Construction Cost of Less than $50,000 or Not Subject to the Act
Review and Inspection of Buildings and Facilities with an Estimated Construction Cost of Less than $50,000 or Not Subject to the Act....
-
G.8. - Does acquiring maintenance or support services for an existing system trigger the requirement for the existing system to meet the Access Board's technical provisions?
New maintenance and support contracts on legacy systems do not require the previously owned EIT to meet the technical provisions of Subparts B or C of the Access Board's standards....
-
Recommendations for Future Research
This cost comparison should involve the cost of the product, the cost of any additional aggregate necessary for stabilizer mix and/or the trail base, the equipment and labor costs associated...
- XLERATOReco Hand Dryer - No Heat Technology
-
S.R. Smith PAL2 Pool Lift Video: Maintenance
Requires the Registered User plan or above. Login!
-
Why Design for Accessibility?
Why Design for Accessibility? I) It serves everyone who uses the facilities. A) Not just people with disabilities, but People carrying packages, People...
-
4.2. Sensitivity Analysis
Sensitivity analysis is an essential consideration for policy makers in evaluating the rule due to the uncertainty associated with certain key variables used in the cost estimation. ...
-
5. Alternatives
$17.3 Audio Hardware Acquisition Costs 0.5 0.4 0.5 0.5 0.6 Captioning Device Acquisition Costs 15.7 15.1 16.6 36.1 15.7...
-
7. Q: Can I charge a maintenance or cleaning fee for customers who bring service animals into my business?
For example, a hotel can charge a guest with a disability for the cost of repairing or cleaning furniture damaged by a service animal if it is the hotel's policy to charge when non-disabled...
-
4. Results
Section 4.1 presents the cost estimation in the primary analysis. Within this section, a detailed breakdown of both the upfront costs and the ongoing annual costs is provided. ...
-
Recreation and Heritage Resources Integrated Business Systems
Standards form the baseline for estimating the total cost for quality visitor opportunities and services....
-
4.2.8. Zero Growth After Five Years
Audio Hardware Acquisition Costs $0.4 $0.5 -13% Captioning Device Acquisition Costs $13.7 $15.7...
-
3. Data Overview
Section 3.4 presents the unit costs currently charged by manufacturers providing the necessary equipment and explains the average unit costs used in the primary analysis. ...
-
2. Public Comments on the Initial Regulatory Assessment and Department Responses
These comments addressed the Department's estimate of staff training costs, notice costs, acquisition and installation costs, replacement costs, and operation and maintenance costs....
-
6.2. Scoping Requirements
Finally, the installation and maintenance and administrative costs increase as they are estimated relative to the equipment acquisition costs. ...
-
Executive Order 12606, The Family
General Counsel, as the Designated Official under Executive Order No. 12606, The Family, has determined that this notice will likely have a significant beneficial impact on family formation, maintenance...
- S.R. Smith MultiLift Pool Lift Video 4: Maintenance and Cleaning
-
Appendix B Trails Study Participation Press Release
This national trails study is designed to analyze parameters such as installation procedures, labor requirements, ongoing maintenance needs, costs, and aggregate combination requirements...
-
City of XXX – ADA Transition Plan
Coordinator and Director of Facilities Area Access Issue Solution Target Date Person Responsible Cost...
-
Summary of Results
implications of these preliminary data are that a trail composed of an all-aggregate material, when constructed to the above-mentioned parameters, could be maintained with little to no maintenance...
-
Assistive listening systems. (Section-by-Section Analysis)
The Department requested comments specifically from arena and assembly area administrators on the cost and maintenance issues associated with ALS, asked generally about the costs and benefits...
- S.R. Smith MultiLift Pool Lift Video 1: Installation, Operation, and Maintenance