Extensions shall return to a wall, guard, or the landing surface, or shall be continuous to the handrail of an adjacent ramp run. ...
Search Results "Kitchen Work Surface"
Commonly Searched Documents
-
11B-505.10.1 Top and bottom extension at ramps
-
1.9.1.1.5
In such cases, the code in place on the date of any construction would be the effective code for such work....
-
QUESTION: WHAT MEANS MAY BE USED TO COMMUNICATE WITH COMPLAINT RESOLUTION OFFICIALS (CROs)?
For example, a variety of electronic means of communication could work....
-
TECHNIQUES FOR OFFICERS TO COMMUNICATE EFFECTIVELY
Officers must review and have a working knowledge of the publication Communicating with People Who Are Deaf or Hard of Hearing: ADA Guide for Law Enforcement Officers. ...
-
904.4 Sales and Service Counters
EXCEPTION: In alterations, when the provision of a counter complying with 904.4 would result in a reduction of the number of existing counters at work stations or a reduction of the number...
-
1.1.3 Scope
In alteration projects, these provisions apply to the area of new work, and include the path of travel requirements found in Section 11B-202.4....
-
1.1 Balance of System (BOS) Equipment
“Projects consisting only of . . . electrical work not involving the placement of switches or receptacles . . . shall not be required to comply with 11B-202.4. unless they affect the usability...
-
2. HOW TO MAKE THE RIGHT CHOICES IN EVALUATING NEW MEDICAL OFFICE
SPACE
This lack of accessibility makes it impossible for many people with disabilities to take part in everyday activities such as going to work, eating in a restaurant or shopping in a store....
-
Vocational Rehabilitation Gains Momentum
Targeting people who could proceed or return to work with assistance, VR helps thousands of people obtain employment....
-
DEFINITIONS AND OPERATIONAL CHARACTERISTICS OF ROAD AND TRAIL USERS
DEFINITIONS AND OPERATIONAL CHARACTERISTICS OF ROAD AND TRAIL USERS This section provides a working definition of each user group....
-
68.10(16) Issue
In the case of a state-funded or other public works project, it is the time at which plans or specifications are publicly posted for bids, after such plans or specifications have been sealed...
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
1.1.3 Scope
In alteration projects, these provisions apply to the area of new work, and include the path of travel requirements found in Section 11B-202.4.◼...
-
1.9.1.1.5
In such cases, the code in place on the date of any construction would be the effective code for such work.◼...
-
Temporary Disabilities
For example, if an individual breaks both legs and is in two casts for several weeks, becomes a wheelchair user for the duration, and the bus route that would normally take him to work is...
-
1.9.1.1.4
In such cases, the code in place on the date of any construction would be the effective code for such work. ◼...
-
[ADA Title III §36.403(b)] Primary function
function include, but are not limited to, the customer services lobby of a bank, the dining area of a cafeteria, the meeting rooms in a conference center, as well as offices and other work...
-
1.1.3 Scope
In alteration projects, these provisions apply to the area of new work, and include the path of travel requirements found in Section 11B-202.4. ◼...
-
Purpose and function—missing the point
The same graphic can have different meanings depending on the context: “Pastel at work” “Pastel at work” This is the same image and alt-text as above, but it is wrong here...
-
Review Process
If the Division Administrator and Civil Rights Specialist believe the State’s transition plan does not meet the minimum attributes, they should work with the State DOT to address the identified...
-
Alterations [4.1.6(1)(f) & (k)]
The intended scope of work and technical feasibility are key factors in determining compliance in alterations to existing elevators....
-
Introduction
TransCen’s work represents the intersection of grassroots implementation and national policy and initiatives....
-
1118B.3
SECTION 1124B - GROUND AND FLOOR SURFACES 1124B.1 General. ...
-
Gates and Barriers
As required in ABAAS, section 307.2, do not allow projections into the clear opening width between the trail surface and 27 inches (685 millimeters) above the trail surface....