A California-registered structural engineer shall examine the project and prepare a written statement certifying that the project does not contain any work of a structural nature....
Search Results "Project Management"
-
1.2.1
-
14.2 Q. If both open and covered parking spaces are provided, how many of each type must be accessible?
., surface parking or garage, that are provided for other residents of the project....
-
6.2 Additional Accessible Elements
6.2 Additional Accessible Elements: The obligation to upgrade the additional accessible elements in Item 6 applies only to those elements within the primary path of travel serving the project-specific...
-
DEFINITIONS
“Content Management System” or “CMS” means the components of the edX software platform with which Course Creators interact, including, without limitation, the HTML editor, video upload screens...
-
§ 35.152(a) General
Public entities that are responsible for the operation or management of detention and correctional facilities, either directly or through contracts or other arrangements, shall comply with...
-
A4.3.10 EGRESS
In buildings where physically handicapped people are regularly employed or are residents, an emergency management plan for their evacuation also plays an essential role in fire safety....
-
11B-812.10.4 Location
EV chargers shall be adjacent to, and within the projected width of, the vehicle space being served. Exceptions: 1....
-
ADA Training
A project of the ADA National Network and sponsored by the Southeast ADA Center....
-
6. ALTERNATIVES
ALTERNATIVES The Office of Management and Budget (OMB) states that regulatory analyses should consider alternatives to the rule or regulation being evaluated.33 Thus, the Department...
-
Floor or Ground Surfaces: ADA Standard Section 502.4
Section 502.4 covers the current ADA Standards for the floor or ground surfaces of accessible parking spaces.
-
New Customers
Using this guidance, a small business owner or manager can ensure that it will not unintentionally exclude people with disabilities and will know when it needs to remove barriers in its...
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
Selection of Participants
Selection of Participants The principal investigators at OSU were to pilot test the survey instruments with professional contacts in parks and recreation that manage pedestrian trails...
-
Background
These are just a few of the problems faced by Land Managers who are trying to make decisions on natural surfacing materials that create a firm and stable trail....
-
Appendix C: Resources
Project UNIFY www.specialolympics.org/projectunify.aspx The Special Olympics' Project UNIFY is supported by the Office of Special Education Programs (OSEP)....
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
11B-202 Existing buildings and facilities
of this code as those requirements or regulations now exist or are hereafter amended consisting of one or more of the following items shall be limited to the actual scope of work of the project...
-
Many properties do NOT have enough electricity available to support significant charging installations, so for now, utilities and others are doing “make ready” spaces (upgrading the supporting infrastructure in a parking space for future use without adding the actual charger). How would make ready spaces comply with the ADA standards? Additionally, consider a site with 10 make ready spaces. Would the standards apply differently if that site has no chargers presently installed versus having one active charger installed?
If the entire project consists of 10 vehicle spaces with the infrastructure installed, but without chargers, then CBC Chapter 11B accessibility provisions do not apply....