During the planning process, firmness must be evaluated for noticeable distortion or compression during the seasons for which the surface is managed, under normally occurring weather conditions...
Search Results "Project Management"
-
Firm
-
A4.3.10 Egress
Because people with disabilities may visit, be employed or be a resident in any building, emergency management plans with specific provisions to ensure their safe evacuation also play an...
-
Firm
During the planning process, firmness must be evaluated for noticeable distortion or compression during the seasons for which the surface is managed, under normally occurring weather conditions...
-
13.9 Franchised Hotel
in the United States that (1) operates under one of the Brands pursuant to a franchise license agreement with HWI (or a subsidiary of HWI); (2) is not an Owned Hotel; and (3) is not a Managed...
-
§ 35.137(b)(2)(v)
of the other power-driven mobility device creates a substantial risk of serious harm to the immediate environment or natural or cultural resources, or poses a conflict with Federal land management...
-
§ 35.190(b)(5) Department of Interior
(5) Department of Interior: All programs, services, and regulatory activities relating to lands and natural resources, including parks and recreation, water and waste management, environmental...
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
11B-404.2.3 Clear width
There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
11B-504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
-
11B-504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
-
11B-504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
- Easter Seals Project: Accessible Community Transportation in Our Nation (ACTION)
- ADA Basic Building Blocks Course (Project of the ADA National Network)
-
Stairs
Full handrail extensions at stairs are not required where they would project hazardously into circulation paths (§505.10, Ex. 3)....
-
§ 36.401(d)(1)(ii)(B)
(B) A series of buildings on a common site, either under common ownership or common control or developed either as one project or as a series of related projects, housing five or more sales...
-
Sec.36.401(d)(1)(ii)(B)
(B) A series of buildings on a common site, either under common ownership or common control or developed either as one project or as a series of related projects, housing five or more sales...
-
Stair widths
However, 1014.8 discusses projections and allows projections into the required width of stairs up to 4 1/2" at or below the handrail height....
-
4.7.6 Built-up Curb Ramps
Built-up curb ramps shall be located so that they do not project into vehicular traffic lanes (see Fig. 13)....
-
4.7.6 BUILT-UP CURB RAMPS
Built-up curb ramps shall be located so that they do not project into vehicular traffic lanes (see Fig. 13)....
-
§100.305(e)(3)
employees of the housing facility or community (and family members residing in the same unit) who are under 55 years of age, provided the employees perform substantial duties related to the management...
-
DORMITORY
where group sleeping accommodations are provided in one room, or in a series of closely associated rooms, for persons not members of the same family group, under joint occupancy and single management...
-
DORMITORY
where group sleeping accommodations are provided in one room, or in a series of closely associated rooms, for persons not members of the same family group, under joint occupancy and single management...
-
704.2.1 Types I and II construction
Projections from walls of Type I or II construction shall be of noncombustible materials or combustible materials as allowed by Sections 1406.3 and 1406.4....