Product Features Fabricated of #18 gauge stainless steel with #4 satin finish Units with greater widths require additional hooks Custom lengths available Product Specs Hook...
Search Results "Ramp Width"
- AJW Architectural Products UJ14 Series UJ14A Hook Strip 26"L, 3 Hooks - Surface Mounted
- Filter Pave™ Porous Paving for Stormwater Management
- Protege Fixed Wheelchair Lift 5442F
- Virtuoso Portable Wheelchair Lift 5460P
- Beneficial Designs Public Rights of Way Assessment Process (PROWAP)
-
382.99 What agreements must carriers have with the airports they serve?
Consistent with the present rule, carriers serving U.S. airports must have agreements with the airport operators to provide, operate, and maintain lifts and ramps used to meet the boarding...
-
Team Player Seating Areas
It is recommended that ramps be used wherever possible for accessible routes connecting team or player seating areas and areas of sport activity....
-
Maneuvering Space
When providing access to ground level and elevated play components by ramps, space allowances to accommodate wheelchairs and mobility devices are required....
-
F235.2.1 Dispersion
The term "boat slip" is intended to cover any pier area other than launch ramp boarding piers where recreational boats are moored for purposes of berthing, embarking, or disembarking....
-
235.2.1 Dispersion
The term "boat slip" is intended to cover any pier area other than launch ramp boarding piers where recreational boats are moored for purposes of berthing, embarking, or disembarking....
-
R302.7.2 Vertical Surface Discontinuities
However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access...
-
235.2.1 Dispersion
The term "boat slip" is intended to cover any pier area other than launch ramp boarding piers where recreational boats are moored for purposes of berthing, embarking, or disembarking....
-
9.2.2(6)
., Equivalent facilitation at a hotel patio or balcony might consist of providing raised decking or a ramp to provide accessibility)....
-
210 Stairways
Standards for Accessible Design What’s New/Different 4.1.3(4) Interior and exterior stairs connecting levels that are not connected by an elevator, ramp...
-
Specific Spaces and Occupancies
noted with an asterisk) and also set forth additional requirements for spaces and facilities provided in housing at a place of education, social service center establishments, and curb ramps...
-
Is vertical access required to all levels of a parking garage?
For example, in underground parking garages, elevators or, where feasible, pedestrian ramps, are necessary to provide an accessible route from parking levels with accessible spaces to the...
-
C. Training
., how to install ramps, the placement of mats over (and not in front of) thresholds). ...
-
810.5.3 Platform and Vehicle Floor Coordination--Modification to 810.5.3 of Appendix D to 36 CFR Part 1191
operationally or structurally feasible to meet the horizontal gap or vertical difference requirements of part 1192 or 49 CFR part 38, mini-high platforms, car-borne or platform-mounted lifts, ramps...
-
Section 206.3
The Department is retaining language from former §10.3.1(1), which provides that “Elements such as ramps, elevators, or other circulation devices, fare vending or other ticketing areas,...
-
Allowances for Typical Roadway Geometry
The draft guidelines also permitted the cross slope of pedestrian access routes within midblock pedestrian street crossings and of curb ramps at midblock pedestrian street crossings to equal...
-
C. Training
., how to install ramps, the placement of mats over (and not in front of) thresholds); and (c) a description of the role of the City’s Election Day Surveyors (EDSs), as set forth in Paragraph...
-
C. Election Judge and Poll Worker Training
., how to install ramps, the placement of mats over (and not in front of) thresholds); and (c) a description of the role of Harris County’s Election Day Surveyors (EDSs), as set forth in...
-
11B-809.8 Doors
Changes in height greater than 1/2 inch (12.7 mm) shall be accomplished by means of a ramp complying with Section 11B-405 or by means of a platform constructed to the level of the floor...
-
Changes in Level within a Dwelling Unit
To require a ramp or other means of access to such an area, at the time of construction, would reduce, perhaps significantly, the space provided by the area....