There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
Search Results "Floor Button"
-
11B-404.2.3 Clear width
-
604.8.1.4 Toe Clearance
The front partition and at least one side partition shall provide a toe clearance of 9 inches (230 mm) minimum above the finish floor and 6 inches (150 mm) deep minimum beyond the compartment-side...
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
[A] ADDITION
[DSA-AC] An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
11B-411.4.8.2.1 Signal type
The signal shall be an automatic verbal annunciator which announces the floor at which the car is about to stop....
-
602.4 Spout Height
Spout outlets shall be 36 inches (915 mm) maximum above the finish floor or ground....
-
11B-602.4 Spout height
Spout outlets shall be 36 inches (914 mm) maximum above the finish floor or ground....
-
4.24.2 HEIGHT
Sinks shall be mounted with the counter or rim no higher than 34 in (865 mm) from the floor....
-
11B-411.4.8.2.1 Signal type
The signal shall be an automatic verbal annunciator which announces the floor at which the car is about to stop....
-
11B-411.4.8.2.1 Signal type
The signal shall be an automatic verbal annunciator which announces the floor at which the car is about to stop....
-
11B-602.4 Spout height
Spout outlets shall be 36 inches (914 mm) maximum above the finish floor or ground....
-
11B-813.2.1 Adult changing table
Adult changing tables shall be fixed to the floor or a wall and shall comply with Section 11B-813.2.1....
-
602.4 Spout Height
Spout outlets shall be 36 inches (915 mm) maximum above the finish floor or ground....
-
F105.2.2 ASME
The communication system must be push button activated. The activation button must be permanently identified with the word "HELP."...
-
Volume Control
In the proposed rule, the Board requested information on the feasibility and cost of equipping new and existing public pay telephones with a mute button and whether such a requirement should...
-
413.1 General (Section-by-Section Analysis)
They suggested that either the scoping of the requirement be modified, or “general purpose” devices be exempted from providing physical buttons for closed captions and audio description....
- Speakman Versatile Shower Combination VS-2054
- Delta Adjustable Grab Bar 2-Setting Hand Shower 52001-UF
- Delta Adjustable Grab Bar 2-Setting Hand Shower 52003-UF
-
809.2.5 Bedrooms in Emergency Transportable Housing Units
The clear floor space must be positioned for a parallel approach to the side of the bed and must be on an accessible route....
- VGo Telepresence Robot
- Neo-Metro Commercial Metaal Toilet 8956 Series
- Neo-Metro Contour Commercial Stainless Steel Toilet 8955 Series
-
TTYs: ADA Standard Section 217.4
Section 217.4 covers scoping requirements in the current ADA Standards for TTYs.