Section 7.4 of FSTAG explains the accessibility requirements for trails, including trail surfacing, clear tread width, grade and cross slope, resting intervals, passing spaces, tread obstacles...
Search Results "Rail Crossing"
-
Technical Requirements for Accessible Hiker/Pedestrian Trails
-
1017.1 General
resting intervals (1017.2); the clear tread width of trails (1017.3); passing spaces (1017.4); tread obstacles (1017.5); openings (1017.6); slopes, including running slope (1017.7.1) and cross...
- Endependence Center, Inc. - Norfolk, VA
- Vermont Center for Independent Living (VCIL) - Montpelier, Burlington, Morrisville, Bennington, Brattleboro, Newport, and Rutland, VT
- AccessAbility
-
Ramps
(See Part 2 of this document for tips on measuring running slopes and cross slopes.) If any part of the accessible route contains steps, it must be ramped....
-
2. Shared Use Paths
guidelines, which address access to sidewalks, streets, and other pedestrian facilities, provide requirements for pedestrian access routes, including specifications for route width, grade, cross...
-
2. Shared Use Paths
guidelines, which address access to sidewalks, streets, and other pedestrian facilities, provide requirements for pedestrian access routes, including specifications for route width, grade, cross...
-
Using the ORAR Exceptions [F202.3, Exception 4 and 1016, Exceptions 1, 2, and 3]
When an ORAR is provided within the roadway, it is exempted from the technical requirements for cross slope, running grade, resting intervals, and passing spaces....
-
1. Typical Issues
When an accessible route crosses a curb, a curb ramp must be provided....
-
2. Shared Use Paths
guidelines, which address access to sidewalks, streets, and other pedestrian facilities, provide requirements for pedestrian access routes, including specifications for route width, grade, cross...
-
2. Shared Use Paths
guidelines, which address access to sidewalks, streets, and other pedestrian facilities, provide requirements for pedestrian access routes, including specifications for route width, grade, cross...
-
II-5.3000 Curb ramps
Public entities that have responsibility or authority over streets, roads, or walkways must prepare a schedule for providing curb ramps where pedestrian walkways cross curbs....
-
2. Shared Use Paths
guidelines, which address access to sidewalks, streets, and other pedestrian facilities, provide requirements for pedestrian access routes, including specifications for route width, grade, cross...
-
Existing Facilities
It does not have jurisdiction over requirements for existing facilities that are otherwise not being altered, except for certain types of transit stations (key stations and intercity rail...
-
105 Referenced Standards
, and accessible surfaces at play areas (105.2.3) International Code Council (ICC), whose International Building Code is referenced with respect to provisions for means of egress and railings...
-
2. Armrests Requirement
that addressed whether armrests should be required was a manufacturer who requested that beds, cots, and stretchers be excluded from the requirements as they are required to have side rails...
-
Existing Trails [F247.2]
Repairing or replacing deteriorated, damaged, or vandalized trail or trailhead structures or parts of structures, including sections of bridges, boardwalks, information kiosks, fencing and railings...
-
III-1.3100 Exceptions
Commercial facilities do not include rail vehicles or any facility covered by the Fair Housing Act. Residential dwelling units, therefore, are not commercial facilities....
-
Developing a plan based on priorities
In order to promote safety, a portable ramp should be properly secured; have railings; and a firm, stable, nonslip surface....
-
Positioning Supports Considered
The Board is considering requiring in the final standards positioning supports such as rails, bars, or panels with handholds to be provided along the sides of diagnostic equipment used by...
-
221.2.3.2 Vertical Dispersion
Points of entry to bleacher seating may include, but are not limited to, cross aisles, concourses, vomitories, and entrance ramps and stairs....
-
Develop a Transition Plan
entity has responsibility or authority over streets, roads, or walkways, its transition plan must include a schedule for providing curb ramps or other sloped areas where pedestrian walks cross...
- Behavioral Safety Products #SF370 Ligature Resistant Sensor Faucet