The design and construction provisions as well as the wind speed map are found in the referenced standard ICC 500 Standard for the Design and Construction of Storm Shelters....
Search Results "New Construction"
Commonly Searched Documents
- International Building Code® (IBC®)
-
ASME
Copies of the referenced standards may be obtained from the American Society of Mechanical Engineers, Three Park Avenue, New York, New York 10016 (http://www.asme.org)....
- Corbin Russwin Inc. ED3000 Series Crossbar Exit Device
-
Alterations: ADA Standard Section 202.3
Section 202.3 covers the most current requirements for alterations in existing building and facilities.
-
11B-221.1 General
For ADA scoping requirements of Title II §35.151(g) and Title III §36.406(f) Standards for New Construction and Alterations; Assembly Areas, see U.S....
- Rebuilding Together Northeast Ohio - Akron, OH
- Corbin Russwin Inc. ED8000 Pushpad Exit Device
- SafePath: Threshold Ramp Installation for MultiFamily Housing for Disability Access
-
7.0 APPLICATION
All trails in the National Forest System that (1) are new or altered; (2) have a Federal Trail Data Standard (FTDS) designation Designed Use of Hiker/Pedestrian; and (3) connect directly...
-
15. ADA Coordinator for the Pedestrian Right of Way
(i) A list of any new construction or projects by the City resulting in improvements to pedestrian rights of way since the last report. 15.5....
-
11B-202.4 Path of travel requirements in alterations, additions and structural repairs
[ADA Title II] §35.151(b) New Construction and Alterations; Alterations....
- Moen M–BITION Chrome One-Handle Lavatory Faucet 8430
- Moen M–BITION Chrome One-Handle Lavatory Faucet 8400
- Moen M–BITION Classic Brushed Nickel One-Handle Lavatory Faucet 8437CBN
-
Section 504
regulations include reasonable accommodation for employees with disabilities; program accessibility; effective communication with people who have hearing or vision disabilities; and accessible new...
-
Accessible Amusement Rides
Bush, New Freedom Initiative, February 1, 2001 The recreation facility guidelines described in this guide focus on newly designed or newly constructed and altered amusement rides....
-
QUESTION: IF A PLATFORM IS OWNED BY A PRIVATE ENTITY OTHER THAN THE PASSENGER RAILROAD, WHAT HAPPENS IF THE PRIVATE ENTITY OBJECTS TO THE CREATION OF A LEVEL BOARDING PLATFORM?
ANSWER: Under section 37.42(b), if there is a new or altered station serving a passenger rail system, in which no track passing through the station and adjacent to the platform...
-
Scoping for Residential Dwelling Units
For purposes of this document, HUD is not changing its scoping requirements for residential dwelling units under its part 8 regulation.15 HUD recipients designing, constructing, altering...
-
For more specific information about ADA requirements affecting employment contact:
Box 66118 Washington, DC 20035-6118 (202) 514-0301 (Voice) (202) 514-0381 (TDD) (202) 514-0383 (TDD) For more specific information about requirements for accessible design in new...
-
Uniform Federal Accessibility Standards (UFAS)
This document presents uniform standards for the design, construction and alteration of buildings so that physically handicapped persons will have ready access to and use of them in accordance...
-
§8.3 Replacement cost of the completed facility
Replacement cost of the completed facility means the current cost of construction and equipment for a newly constructed housing facility of the size and type being altered....
-
11B-407.4.7 Designations and indicators of car controls
Exception: In existing elevators, where a new car operating panel complying with Section 11B-407.4.7 is provided, existing car operating panels may remain operational and shall not be required...
-
APPROVED
[DSA-AC] “Approved” means meeting the approval of the enforcing agency, except as otherwise provided by law, when used in connection with any system, material, type of construction, fixture...
-
704.2.3 Combustible projections
Combustible projections located where openings are not permitted or where protection of openings is required shall be of at least 1-hour fire-resistance-rated construction, Type IV construction...