Otherwise, in new construction, ADAAG requires areas of rescue assistance unless the building is equipped with a supervised automated sprinkler system....
Search Results "Rail System"
Commonly Searched Documents
-
Egress [4.1.3(9), 4.3.10]
-
F. Chapter 5: Doorways, Circulation Paths, and Fare Collection Devices
Chapter 5 in the 2016 Non-Rail Vehicle Guidelines contains the technical requirements for doorways, illumination at doorways and boarding and alighting areas, passenger access routes, and...
-
F202.6.5.5 Assembly Areas
Assistive listening systems shall comply with F219 and assembly seating shall comply with F221....
-
1003.2.13.3 Elevators
Elevators are not required to be accessed from an area of refuge or horizontal exit in buildings and facilities equipped throughout with an automatic sprinkler system installed in accordance...
-
810.6.2 Routes and Destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
810.6.2 Routes and Destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
Accessible Room Set-Up
throughout and use the amenities independently; people who are blind or have low vision can navigate easily and safely; people who are deaf or have hearing loss can use assistive listening systems...
-
810.6.2 Routes and Destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
11B-810.6.2 Routes and destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
1009.11 Instructions
Directions for use of the two-way communications system where provided. ETA Editor's Note CBC 1009.11 does not include “Directions to find other means of egress”....
-
1.1.8 Alternate measurement tools
If the F - number system is used pedestrian paths should have a minimum FF of 25. Running slope should be measured along the same lines of measurements as given in Section 1.1.3....
-
11B-810.6.2 Routes and destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
11B-810.6.2 Routes and destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
1009.11 Instructions
Directions for use of the two-way communications system where provided. ETA Editor's Note CBC 1009.11 does not include “Directions to find other means of egress”....
-
T208 Passenger Access Routes
[See subsections ...]
-
§ 38.125(b)(8) Platform entrance ramp
(8) Platform entrance ramp. The entrance ramp, or loading-edge barrier used as a ramp, shall not exceed a slope of 1:8, when measured on level ground, for a maximum rise of 3 inches,...
-
§ 38.123(a)(5)
(5) Doorways on the end of the enclosure, opposite the water closet, shall have a minimum clear opening width of 32 inches. Doorways on the side wall shall have a minimum clear...
- Inclusion Solutions Functional Needs Support Services (FNSS) Shelter Tool Kit
- Feeling Safe, Being Safe Webcast Training: Being Prepared
- Feeling Safe, Being Safe Webcast Training: The Emergency Worksheet
- Feeling Safe, Being Safe Webcast Training: Introduction & Materials
- Feeling Safe, Being Safe Webcast Training: The Emergency Kit
-
§ 38.107(a)(3)
(3) A grab bar at least 24 inches long shall be mounted behind the water closet, and a horizontal grab bar at least 40 inches long shall be mounted on at least one side wall, with...
-
Two-way Communication [4.3.11.4]
The two-way communication system must be equipped with both audible signals (for people with vision impairments) and visual signals (for people with hearing impairments) and cannot operate...