working condition on Election Day those features of facilities and equipment (including permanent equipment such as lifts and elevators and temporary equipment such as portable ramps, traffic...
Search Results "Air Traffic Control Tower"
-
A. Accessible Voting Program
-
608.6 Shower Spray Unit and Water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
608.6 Shower Spray Unit and Water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
608.6 Shower Spray Unit and Water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
608.6 Shower Spray Unit and Water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
Plantronics Clarity Ensemble TTY Phone
Requires the Registered User plan or above. Login!
-
ETA Public Telephone Summary Chart and Survey Instructions
this chart means complying with the requirements of 4.31.2 (clear floor or ground space), 4.31.3 (mounting height), 4.31.4 (protruding objects), 4.31.5 (hearing aid compatible and volume control...
-
Utility Sinks
Ensure that sink controls and operating mechanisms comply with the technical requirements for reach ranges and operability specified in ABAAS, sections 308 and 309, and that water spouts...
-
11B-604.5.2 Rear wall
Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
-
11B-604.5.2 Rear wall
Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
-
11B-604.5.2 Rear wall
Where an administrative authority requires flush controls for flush valves to be located in a position that conflicts with the location of the rear grab bar, then the rear grab bar shall...
-
709.8 Duct and air transfer openings
Penetrations by duct and air transfer openings shall comply with Sections 711 and 715....
-
11B-250 Circulation paths
[See subsections ...]
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
11B-608.6 Shower spray unit and water
The shower spray unit shall have an on/off control with a non-positive shut-off....
-
711.3.3 Ducts and air transfer openings
Penetrations of fire-resistance-rated walls by ducts and air transfer openings that are not protected with fire dampers shall comply with this section....
-
T704 Announcement Systems
[See subsections ...]
-
§27.71(k)(3)(ii) Timing.
(ii) Timing. Where a timed response is required, the user must be alerted visually and by touch or sound and must be given the opportunity to indicate that more time is required;
-
§ 27.71(k)(3)(ii) Timing
(ii) Timing. Where a timed response is required, the user must be alerted visually and by touch or sound and must be given the opportunity to indicate that more time is required;
-
T704 Announcement Systems
The technical requirements for announcement systems include provisions on automated route identification announcement systems, automated stop announcement systems, and stop request...
-
11B-812.10.2 Operable parts
Operable parts and charging cord storage shall comply with Section 11B-309.
-
11B-812.10.2 Operable parts
Operable parts and charging cord storage shall comply with Section 11B-309.