EV chargers shall comply with Section 11B-812.10.
Search Results "EVCS: Electric Vehicle Charging Station"
Commonly Searched Documents
-
11B-812.10.1 General
-
11B-812.10.1 General
EV chargers shall comply with Section 11B-812.10.
-
There is some confusion about whether the “accessible path” that is required means there must be an accessible path from the EVSE (charger) to the facility/building at which the station is installed, or whether the accessible path is just from the parking spot to the EVSE (charger). If the prior is enforced, it could increase the costs of installing EVSE in some instances. What is the correct interpretation of “accessible path”?
EVCS required by CBC Chapter 11B to be accessible must have both, an accessible route to the facility entrance (see CBC Section 11B-812.5.1) and an accessible route from the vehicle space...
-
We often see projects of gas station replacing old fuel dispensers with access compliance fuel dispensers (reach range, operable parts, point-of-sale). According to Section 11B-202.4, Exception 10, these projects would be required to comply with accessibility for primary accessible path to inside the convenient store at the gas station, public restrooms, drinking fountains, public telephones, and signs (with 20-percent limit of adjusted construction cost). Is my understanding correct regarding the replacement of old/addition of new fuel dispensers?
RESPONSE: Exception 10 to Section 11B-202.4 is only applicable to the installation of EVCS – the exception does not apply to gasoline filling equipment....
-
11B-812.5.2 Accessible route to EV charger
An accessible route complying with Section 11B-402 shall connect the vehicle space and the EV charger which serves it....
-
11B-812.5.2 Accessible route to EV charger
An accessible route complying with Section 11B-402 shall be provided between the vehicle space and the EV charger which serves it....
-
11B-220.2 Point-of-sale devices
Corrects code references for applicable technical requirements for point-of-sale devices, and adds requirement for point-of-sale devices at electric vehicle charging stations....
-
11B-812.7 Access aisle
Two vehicle spaces or one parking space and one electric vehicle charging space shall be permitted to share a common access aisle....
-
What accessibility requirements apply to EV charger installation outside of California?
RESPONSE: To the extent that EVCS are a public accommodation or commercial facility they are covered by the federal law of the Americans with Disabilities Act....
-
11B-228.3.1.1 Existing facilities
Where new EVCS are added to a facility with existing EVCS, the requirements of Section 11B-812 shall apply only to the new EVCS installed....
-
11B-228.3.1.1 Existing facilities
Where new EVCS are added to a facility with existing EVCS, the requirements of Section 11B-812 shall apply only to the new EVCS installed....
-
There does not seem to be a distinction between different EVCS standards (Level 1, Level 2, DC CHAdeMO, DC CCS, and Tesla). Does the schedule defined in Table 11B-228.3.2.1 make a distinction between the different types of EVSE standards or are that all considered to equivalently be an EVCS?
RESPONSE: The CBC Chapter 11B accessibility requirements for EVCS do not distinguish between the different EVCS standards like those listed....
-
TECHNICAL QUESTIONS:
[See subsections ...]
- CalCasp Training: 2016 California Building Code Chapter 11B
-
11B-812.10.4 Location
EV chargers shall be adjacent to, and within the projected width of, the vehicle space being served....
-
11B-228.3.2 Minimum number
Where an EV charger can simultaneously charge more than one vehicle, the number of EV chargers provided shall be considered equivalent to the number of electric vehicles that can be simultaneously...
-
How can we address locations that do not have excess parking spaces and currently, cannot pass through plan check because the code says it’s now a “charging space” not a “parking space”? With the current requirements, you need more Van Accessible and ADA reserved parking spaces than required under code with the combination of EV charging and standard spaces. It puts an impossible burden on small parking lots in Irvine and San Diego which are strictly enforcing the interpretation of charging spaces.
Consistent with the state’s policies on electric vehicles, DSA encourages city and county officials to recognize the necessary impact of EVCS and adopt responsive ordinances consistent with...
-
11B-812.8.2 Five to twenty-five
Where five to twenty-five total EVCS are provided, one van accessible EVCS shall be identified by an ISA complying with Section 11B-703.7.2.1....
-
11B-812.8.2 Five to twenty-five
Where five to twenty-five total EVCS are provided, one van accessible EVCS shall be identified by an ISA complying with Section 11B-703.7.2.1....
-
11B-812.8.3 Twenty-six or more
Where twenty-six or more total EVCS are provided, all required van accessible and all required standard accessible EVCS shall be identified by an ISA complying with Section 11B-703.7.2.1...
-
11B-812.8.3 Twenty-six or more
Where twenty-six or more total EVCS are provided, all required van accessible and all required standard accessible EVCS shall be identified by an ISA complying with Section 11B-703.7.2.1...
-
11B-812.8.1 Four or fewer
Where four or fewer total EVCS are provided, identification with an International Symbol of Accessibility (ISA) shall not be required....
-
11B-812.8.1 Four or fewer
Where four or fewer total EVCS are provided, identification with an International Symbol of Accessibility (ISA) and signs identifying van accessible spaces shall not be required....
-
Currently, the DCFC time limit is 30 minutes maximum. New larger battery capacity will take longer to get 80% charge – i.e. Chevy Bolt EV, Tesla Model 3, 2018 Nissan LEAF, etc. Can we reconsider the time limit?
RESPONSE: The 30 minute time limit applies to drive-up EVCS of any type....