All portions of counters required to comply with 904 shall be located adjacent to a walking surface complying with 403. Advisory 904.2 Approach....
Search Results "Work Surface"
-
904.2 Approach
-
5.4.8 Transfer Support Gripping Surface Hazard for Equipment Used in a Supine, Prone, Side-Lying, or Seated Position
5.4.8 Transfer Support Gripping Surface Hazard for Equipment Used in a Supine, Prone, Side-Lying, or Seated Position....
-
904.2 Approach
All portions of counters required to comply with 904 shall be located adjacent to a walking surface complying with 403. Advisory 904.2 Approach....
-
Transfer Surface Height (M301.2.1 and M302.2.1)
surface....
-
Costs and Personnel Time for EWF Installation
Personnel time Drainage system installation, 25 h @ $15/h $375 Unbonded EWF installation, 60 h @ $10/h 600 Bonded surface...
-
11B-904.2 Approach
All portions of counters required to comply with Section 11B-904 shall be located adjacent to a walking surface complying with Section 11B-403....
-
11B-904.2 Approach
All portions of counters required to comply with Section 11B-904 shall be located adjacent to a walking surface complying with Section 11B-403....
-
11B-904.2 Approach
All portions of counters required to comply with Section 11B-904 shall be located adjacent to a walking surface complying with Section 11B-403. Advisory 11B-904.2 Approach....
-
M302.2 Transfer Surface (Section-by-Section Analysis)
This is an introductory section.
-
Conclusion
Conclusion Preliminary results from this study indicate that there is no perfect playground surface. ...
-
11B-203 General exceptions
with disabilities can approach, enter, and exit the employee work area....
-
Inpro Corporation JointMaster® AR Series Seal Expansion Joint Systems
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Inpro Corporation JointMaster® DR Series Seal Expansion Joint Systems
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Rough Grade Site Inspection
Verify that drainage, drainage swales, catch basins and grates do not violate slope or surface requirements along accessible routes, accessible parking and access aisles, etc....
-
Rough Grade Site Inspection
Verify that drainage, drainage swales, catch basins and grates do not violate slope or surface requirements along accessible routes, accessible parking and access aisles, etc....
-
23. How should an employer handle requests for modified or part-time schedules for an employee covered by both the ADA and the Family and Medical Leave Act (FMLA)?
health plan during the period of FMLA leave, provided the employee pays his/her share of the premium.(70) Example: An employee with an ADA disability requests that she be excused from work...
-
1008.2.6 Ground Surfaces
Ground surfaces on accessible routes, clear floor or ground spaces, and turning spaces shall comply with 1008.2.6. Advisory 1008.2.6 Ground Surfaces....
- Pilot Rock APTX Snow Load/Extreme Load Full Size Pedestal Utility Table
-
1.1.5 Flatness of walk running slope
Measure the distance between the straightedge and the surface at the largest gap. See Fig. 1(a)....
-
14. What kinds of reasonable accommodations are related to the benefits and privileges of employment?
Example 21: Karin, who is deaf, works as an associate in a large investment firm....
-
3306.2 Walkways
Walkways shall be provided with a durable walking surface....
-
3306.2 Walkways
Walkways shall be provided with a durable walking surface....
-
6. Acquisition or Modification of Equipment and Devices
Cost $0; A telephone amplifier designed to work with a hearing aid allowed a plant worker to retain his job and avoid transfer to a lower paid job....
-
5.2.1.3 Transfer Surface Size for Stretchers
5.2.1.3 Transfer Surface Size for Stretchers. The transfer surface should be 28 inches wide minimum and 17 inches deep minimum located on both long sides of stretchers....