This section derives from the guidelines the Board developed for recreation facilities and has been included in the final rule without substantive change....
Search Results "Developed Recreation Site"
Commonly Searched Documents
-
612 Saunas and Steam Rooms
- ADA Veracity ADA Pro Application
- International Disability and Development Consortium (IDDC)
-
Accessibility Evaluation Surveys
This information is important for developing transition plans and for providing useful information about the wide range of Forest Service facilities. A U.S....
-
It appears that the accessibility standards may result in lots of chargers in ADA spaces not being used or “stranded assets.” Was this issue addressed in development of the standards?
RESPONSE: This issue was discussed extensively during development of the CBC Chapter 11B accessibility provisions for EVCS....
-
204 Protruding Objects
Exceptions developed for sport activity areas and play areas in separate rulemakings on recreation facilities and on play areas are included in the final rule (204.1 Exceptions 1 and 2)....
-
Section 4.1.2, Accessible Sites and Exterior Facilities: New Construction (Preamble, Section-by-Section Analysis)
• Section 4.1.2, Accessible Sites and Exterior Facilities: New Construction This section addresses exterior features, elements, or spaces such as parking, portable toilets, and exterior...
- The Division on Career Development and Transition (DCDT)
-
809.5.6 Site, Building, or Floor Entrance
Where a system, including a closed-circuit system, permitting voice communication between a visitor and the occupant of the residential dwelling unit is provided, the system shall...
-
809.5.6 Site, Building, or Floor Entrance
Where a system, including a closed-circuit system, permitting voice communication between a visitor and the occupant of the residential dwelling unit is provided, the system shall...
-
10.2.2 Bus Stop Siting and Alterations
[See subsections ...]
-
III-7.4000 Sites and exterior facilities
[See subsections ...]
- Lake Ledge Naturalist Audio Description
-
G.4.i. - Do the standards require a contractor's workplace to be Section 508 compliant?
For example, if a Federal agency enters into a contract to have a web site developed, the web site is required to meet the applicable technical provisions of the Access Board's standards...
-
F247.1 General
A trail is a pedestrian route developed primarily for outdoor recreational purposes....
-
5.1.2 Level or Sloped Entry
Camp shelters providing roll-in access shall have a level or sloped entry that complies with the FSORAG Outdoor Recreation Access Route technical provisions if the camp shelter is in a campground...
-
13.1 Q. Are the public and common use areas of a newly constructed development that consists entirely of buildings having four or more multistory townhouses, with no elevators, required to be accessible?
If there are no covered multifamily dwellings on a site, then the public and common use areas of the site are not required to be accessible....
- AccessRec LLC WaterWheels, the Floating Beach Wheelchair - Assembly
-
Section 4.1.2, Accessible Sites and Exterior Facilities: New Construction (Section-By-Section Analysis and Response to Comments)
- Section 4.1.2, Accessible Sites and Exterior Facilities: New Construction (Section-By-Section Analysis and Response to Comments) This section addresses exterior features, elements,...
-
Note
Items included to be inspected for compliance if provided, including but not limited to: outdoor developed areas, bus shelters, amusement rides, recreational boating facilities, fishing...
-
Note
Items included to be inspected for compliance if provided, including but not limited to: outdoor developed areas, bus shelters, amusement rides, recreational boating facilities, fishing...
-
DSA IR 11B-9: Accessibility Requirements for Solar Photovoltaic Systems at School Sites
Please check the DSA web site for currently effective IRs....
-
Water Hydrants
The surface at the base of water hydrants at recreation areas must be firm and stable with a 60-inch turning radius. See the "Surfaces" rule of thumb above....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....