with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation of the following factors: The cost...
Search Results "Capital Construction Cost"
Commonly Searched Documents
-
UNREASONABLE HARDSHIP
-
UNREASONABLE HARDSHIP
with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation of the following factors: The cost...
-
§ 37.139(d)(6)
(6) A budget for comparable paratransit service, including capital and operating expenditures over five years....
-
2.1. General Assumptions
This section details the general assumptions used in the cost estimation in the primary analysis. First, the parameters of the analysis are covered. ...
-
UNREASONABLE HARDSHIP
The cost of providing access. 2. The cost of all construction contemplated. 3. The impact of proposed improvements on financial feasibility of the project. 4....
-
2.4.2
2.4.2 When defining acceptable methods of correction for a non - complying element, give reasonable consideration to how the remedial action may affect construction time, cost, adjacent...
-
Why test on straight courses and P-shaped turning courses?
Constructing long test courses enables comparison of subject data with research done by other investigators in which subjects walk on a straight linear course or in large diameter circles...
-
6. Regulatory Analyses
State and local government entities that design and construct shared use paths generally use the AASHTO Guide....
-
Facilities Serving Beaches [F248.1.1]
Beach access routes are required when an entity that administers or manages a beach constructs or alters any circulation paths, parking facilities, toilet facilities, or bathing facilities...
-
1.1
DSA review and approval is not required for alteration or reconstruction projects to school buildings governed by the Field Act with an estimated construction cost of $103,300, or less,...
-
36. Would you recommend the methods of construction and/or soil stabilizer application to others with similar trail compositions/environments?
Would you recommend the methods of construction and/or soil stabilizer application to others with similar trail compositions/environments? Yes No N/A...
-
Common Problems with New Construction and Alterations
People who use wheelchairs, scooters, crutches, and other with mobility aids often find that both newer and older city and county facilities have parking, routes to and through...
-
Subpart D-New Construction and Alterations
[See subsections ...]
-
III-7.5000 Buildings: New construction
[See subsections ...]
-
CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION
ETA Editor's Note This Pocket Guide contains only the excerpts from California Building Code Chapter 33 that are adopted by Division of the State Architect - Access Compliance...
-
CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION
ETA Editor's Note This Guide contains only the excerpts from California Building Code Chapter 33 that are adopted by Division of the State Architect - Access Compliance...
-
68.20(g) Building Inspection
(g) Buildings or facilities with an estimated construction cost of less than $50,000 or not subject to the Act and compliance with TAS may be registered, reviewed, and/or inspected by a...
-
SCOPING SCENARIOS: RANGE OF POSSIBILITIES
We also considered a 100 percent adoption rate to show the full range of potential costs....
-
VALUATION THRESHOLD
The baseline valuation threshold of $50,000 is based on the January 1981, “ENR US20 Cities” Average Construction Cost Index (CCI) of 3372.02 as published in Engineering News Record, McGraw...
-
2.1.1
2.1.1 Clearly state the required installed tolerances for critical construction elements....
-
Appendix D to Part 37—Construction and Interpretation of Provisions of 49 CFR Part 37
Sept. 6, 1991, as amended at 61 FR 25416, May 21, 1996; 71 FR 63266, Oct. 30, 2006; 76 FR 57936, Sept. 19, 2011; 79 FR 21406, Apr. 16, 2014] This appendix explains the Department's construction...
-
F248.1.1 Facilities Serving Beaches
Beach access routes shall be provided in a number complying with F248.2 where the entity that administers or manages a beach constructs or alters any of the following facilities to serve...
-
II-6.3100 General principles
Cost is not a factor (§4.1.6(1)(j))....
-
1.2
DSA review and approval is not required for alteration or reconstruction projects to school buildings governed by the Field Act with an estimated construction cost greater than $103,300,...