If tolerances stricter than those given in an industry standard are required for a specific project, these should be stated, with the recognition that tighter tolerances may increase construction...
Search Results "Horizontal Projection"
Commonly Searched Documents
-
2.1.1
-
Protrusion Limits [§307.2]
Objects mounted on walls, partitions, columns, and other elements along circulation paths can pose hazards unless their projection is limited....
-
4. Access to Newly Constructed and Altered Facilities
will upgrade noncompliant curb ramps and/or install new curb ramps where existing ramps are lacking in connection with street resurfacing and repaving and other major street improvement projects...
- Bradley 2.8 Gallon Waste Receptacle 3257
-
Background
Access Board funded this project to deal with them. Many trade groups have developed standard tolerances for certain aspects of construction....
- Disability and Employment Resources: SCVRD Part 1
- Communicating with people with disabilities: Ask Me First Video
-
Communicating with People with Disabilities: Talk to Me Please
Requires the Registered User plan or above. Login!
-
Communicating with People with Disabilities: What Are You Saying
Requires the Registered User plan or above. Login!
-
Multiple Chemical Sensitivities and Electromagnetic Sensitivities
The Board also is sponsoring a project on indoor environmental quality....
-
Narrative description. (Section-by-Section Analysis)
The descriptions are narrated and recorded onto an audiotape or disk that can be synchronized with the film as it is projected....
-
DOJ Compliance Highlights
Comply with all 2010 ADA Standards for Accessible Design for new construction and remodeling projects....
-
F247.1 General
requirement for trails in 1017 are required to comply with the technical requirements for trails in 1017. 8 The Federal Trail Data Standards are available at: http://www.fgdc.gov/standards/projects...
-
4.2.8. Zero Growth After Five Years
The projected growth rate of the number of auditoriums within each venue type is discussed in Section 3.1.3. ...
-
Exception 9
In alteration projects involving buildings and facilities previously approved and built without elevators, areas above and below the ground floor are subject to the 20-percent disproportionality...
-
2. Shoulder Breadth
Shoulder breadth was computed as the horizontal distance between the lateral (outer) aspects of the deltoids....
-
Detectable Warnings
proposed rule, consistent with the original ADAAG, provided specifications for the coordination of vehicles and platforms, including maximum changes in level (plus or minus e inch) and horizontal...
-
1007.7.4 Separation
The fire-resistance-rated exterior wall construction shall extend horizontally 10 feet (3048 mm) beyond the landing on either side of the landing or equivalent fire-resistance-rated construction...
-
608.3 Grab Bars
Where multiple grab bars are used, required horizontal grab bars shall be installed at the same height above the finish floor....
-
1002.4.3 Gaps
coordinated so that, when amusement rides are at rest in the load and unload position, the vertical difference between the floors shall be within plus or minus 5/8 inches (16 mm) and the horizontal...
-
307.2 Protrusion Limits
Objects with leading edges more than 27 inches (685 mm) and not more than 80 inches (2030 mm) above the finish floor or ground shall protrude 4 inches (100 mm) maximum horizontally into...
-
Bathroom Accommodating Reduced Ambulatory Mobility
Built-in seat in aromatherapy shower Soap dispenser (to prevent a fall from retrieving bar soap from the floor) Vertical and horizontal shower grab bars Hidden fold-down...
-
Department of Justice method
While holding the uphill end of the level on the pavement, place a pencil under the other end and roll it toward the uphill end of the level until the horizontal air bubble shows level....
-
810.5.3 Platform and Vehicle Floor Coordination--Modification to 810.5.3 of Appendix D to 36 CFR Part 1191
In light rail, commuter rail, and intercity rail systems where it is not operationally or structurally feasible to meet the horizontal gap or vertical difference requirements of part 1192...