Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
Search Results "Capital Construction Cost"
-
F203.3 Construction Sites
-
203.2 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
Costs
Access Routes $4,497 to $6,530 to purchase roll-out mats for beach access routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed...
-
68.101(c)(1) New construction
(1) New construction shall comply with TAS 201.1....
-
3.4.5. Unit Costs by Venue
The Final RA estimates the average unit costs of the hardware and the devices based on the retail prices of all currently-available equipment from the three manufacturers....
-
Outdoor Constructed Features Along Trails [F247.5]
When outdoor constructed features, such as benches (figure 11), picnic tables, or trash and recycling receptacles, are provided along a trail, at least 20 percent, but no less than one,...
-
Sec. 12201. Construction. [Section 501]
[See subsections ...]
-
F247.5 Outdoor Constructed Features
Where outdoor constructed features are provided on trails, other than within facilities specified in F247.4, at least 20 percent, but not less than one, of each type of outdoor constructed...
-
Outdoor Constructed Features
[See subsections ...]
-
§104.39(b)
the provision of an appropriate education to handicapped persons than to nonhandicapped persons except to the extent that any additional charge is justified by a substantial increase in cost...
-
2.2. Total Costs
The total costs quantified for the final rule are comprised of the following: Upfront Costs (One-time) Acquisition costs for captioning hardware for existing and new auditoriums...
-
§ 37.43(e)(2)(ii)
(ii) Costs associated with making restrooms accessible (e.g., grab bars, enlarged toilet stalls, accessible faucet controls);...
-
§ 35.151(a) Design and construction
(a) Design and construction....
-
§ 35.151(a) Design and construction.
(a) Design and construction....
-
68.10(7) Construction Documents
(7) Construction Documents--Drawings, specifications, addenda, change orders, construction change directives and other supplemental documents prepared for the purpose of regulatory approval...
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...
-
8. New Construction and Alterations
New Construction and Alterations Otherwise, as previously agreed, new construction and alterations within the meaning of 28 C.F.R. § 35.151 will not count toward the $31 million, including...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....
-
NEW CONSTRUCTION AND ALTERATIONS {35.151}
NEW CONSTRUCTION AND ALTERATIONS {35.151} New Construction Shall be designed and constructed to be readily accessible to and usable by individuals with disabilities...
-
4.2.4. Single-Auditorium Movie Theater Unit Costs Including Sony’s Technology
The cost per captioning device increases from $466 to $727 when including Sony’s technology in the average unit cost estimate....
-
3.4.2. Audio Description Hardware Unit Costs
Table 3-20 : Additional Cost for Audio Description Hardware Technology Cost Per Theater for Audio Description Hardware Doremi Captiview...
-
New Construction
New Construction ADA requirements for new construction have been in effect since January 1992....
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....
-
11B-101.1 General
[ADA Title II] §35.151(a) New construction and alterations; Design and construction....