(iii) Costs associated with providing accessible telephones (e.g., relocation of phones to an accessible height, installation of amplification devices or TDDs);...
Search Results "Capital Construction Cost"
Commonly Searched Documents
-
§ 37.43(e)(2)(iii)
-
2.4.4.1. Repair Costs
costs. ...
-
NEW CONSTRUCTION {35.151}
NEW CONSTRUCTION {35.151} “Each facility or part of a facility constructed by, on behalf of, or for the use of a public entity shall be designed and constructed in such manner that the...
-
2.4. Ongoing Costs
In addition to the upfront costs associated with hardware and device acquisition and installation, movie theaters will incur ongoing annual costs to maintain and operate captioning and...
-
11B-233.3.1 Minimum number: new construction
Newly constructed facilities with residential dwelling units shall comply with Section 11B-233.3.1....
-
New Construction
New Construction The ADA requires that all new facilities built by public entities must be accessible to and usable by people with disabilities....
-
8.1. Annual Costs
Table 8-1 : Annual Costs Over Period of Analysis in Primary Analysis, Discounted at 7 Percent ($ millions) Primary Analysis Total Costs 2016...
-
F. Cost and benefits of movie captioning and video description regulations
Currently, what are the general costs to convert to digital cinema? Are the costs different for small entities? If so, why? What are the costs for small entities?...
-
Transits and construction lasers
Transits and construction lasers are useful for setting or measuring overall elevation points to determine a total slope....
-
3.4. Unit Costs
Because this was a relatively new and expensive technology, the Department excluded it from the average unit cost estimates in the Initial RA. ...
-
Costs and Personnel Time for EWF Installation
The following summary of costs and time estimates is not meant to be definitive. Markup for contractors or other overhead and profits is not included....
-
Construction (Trail Terminology)
Construction is building a new trail or segment of trail where there was no trail before....
-
Deferred Maintenance
Include the costs for any uncompleted work that is needed to bring a building into compliance with the provisions of ABA that were in force at the time of construction or major improvement...
-
68.51. Review of Construction Documents
Review of Construction Documents....
-
Construction Sites (§203.2)
Construction Sites (§203.2) Structures directly associated with the actual processes of construction and portable toilets used only by construction workers Examples: scaffolding...
-
203.2 Construction Sites
203.2 Construction Sites....
-
§104.23(a) Design and construction
(a) Design and construction. ...
-
New Construction
New Construction – facilities constructed for first occupancy after January 26, 1993 where the construction documents were submitted for permitting after January 26, 1992....
-
F203.3 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
203.2 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
4.1.1. Total Costs
Total costs in the primary analysis are calculated by venue type and include the cost categories listed below: Captioning Hardware Acquisition Costs; Audio Description...
-
Costs
Access Routes $4,497 to $6,530 to purchase roll-out mats for beach access routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed...
-
68.101(c)(1) New construction
(1) New construction shall comply with TAS 201.1....
-
3.4.5. Unit Costs by Venue
The Final RA estimates the average unit costs of the hardware and the devices based on the retail prices of all currently-available equipment from the three manufacturers....