Specifications: FABRICATION: All steel, all welded construction, including: 3/8-inch x 1-inch vertical steel ribs. ...
Search Results "Capital Construction Cost"
Commonly Searched Documents
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
- Pilot Rock BPR1 Bear Resistant Trash Receptacle
-
C. Costs and Benefits
costs for audio description hardware; Acquisition costs for captioning devices; Acquisition costs for audio description devices; Installation costs for captioning...
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3
- Bosch 3 Point Self Leveling Alignment Laser Level GPL 3 S
-
2.3.3. Installation Costs
Therefore, this could result in an additional upfront cost after equipment acquisition. ...
-
2.3. Upfront Costs
The acquisition costs, along with installation costs, are the upfront costs incurred by a movie theater as a result of the rulemaking. ...
-
BENEFITS AND COSTS: SUMMARY
BENEFITS AND COSTS: SUMMARY Therefore, while establishing these requirements will result in significant costs to health care providers, establishing a lower adjustable height requirement...
-
V. Support Costs
"Support Costs" means only those incremental costs and expenses incurred by the City as a result of implementing or performing the terms of this Settlement Agreement which would not otherwise...
-
BENEFITS AND COSTS: OVERVIEW
BENEFITS AND COSTS: OVERVIEW Based on our analysis, we determined that transfer surface height requirements lower than 19 inches would increase the cost of designing and manufacturing...
-
Flange way gap
For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
-
Standards Applicable Prior to March 15, 2012
use the 2010 Standards as adopted in the Title II regulations, except that Exception (1) in Section 206.2.3 does not apply, as an acceptable alternative accessibility standard for new construction...
-
7. Support Costs
Support Costs The City will only charge incremental costs that the City will incur as a result of implementing the program, which would not otherwise be incurred if the program did not...
- Magnuson Group UMEA Waste Receptacles
-
Summary of Costs and Benefits
We estimated the additional costs under three scenarios....
-
1011.1 General
This section contains the technical requirements for outdoor constructed features provided within camping facilities, picnic facilities, viewing areas, and trailheads or on trails....
-
Overview
Newly constructed and altered pools must meet these requirements. Public entities and public accommodations also have obligations with respect to existing pools....
- Husky 10" Multi-Function Standard Digital Level
- Simple Pump Company ADA 100 Simple Water Pump
- Sears Brands, LLC Craftsman 10 in. Digital LaserTrac® Level
-
Accessibility Standards in Title II Regulations Issued by DOJ
The Title II regulations provide that design, construction, and alterations of facilities commenced after January 26, 1992, must be done in such a manner that the facility or part of the...
-
Attorney’s Fees and Costs
Attorney’s Fees and Costs – The City shall pay Class Counsel $13.3 million as reasonable attorney’s fees and $1.7 million for costs and expenses, for a total of $15 million....
-
4.1.3(5)*
In new construction if a building or facility is eligible for this exemption but a full passenger elevator is nonetheless planned, that elevator shall meet the requirements of 4.10 and shall...