The distinction matters because under § 37.43(a)(1), Defendants must make certain alterations to increase accessibility no matter the cost, while under § 37.43(a)(2), Defendants must make...
Search Results "Construction Cost"
Commonly Searched Documents
-
UNITED STATES OF AMERICA v. METROPOLITAN TRANSPORTATION AUTHORITY and NEW YORK CITY TRANSIT AUTHORITY - OPINION & ORDER
-
202.4.1 Disproportionate Cost
202.4.1 Disproportionate Cost....
-
A4.17.3 Size and Arrangement
six or more toilet stalls are provided, it is therefore required that a 36 in (915 mm) wide stall with parallel grab bars be provided in addition to the standard stall required in new construction...
-
Education's Enforcement of DOJ's Title II Regulations
For new construction and alterations commenced on or after March 15, 2012, the 2010 Title II ADA Standards will be used by Education in its enforcement of the Title II regulations.[28]...
- Landscape Forms Inc. Presidio Trash Receptacle
-
C. Costs and Benefits
costs for audio description hardware; Acquisition costs for captioning devices; Acquisition costs for audio description devices; Installation costs for captioning...
-
2.3.3. Installation Costs
Therefore, this could result in an additional upfront cost after equipment acquisition. ...
-
Costs and Benefits
The Initial RA assesses the likely costs and benefits of the proposed rule. ...
- Landscape Forms Inc. Wellspring Trash Receptacle
-
2.3. Upfront Costs
The acquisition costs, along with installation costs, are the upfront costs incurred by a movie theater as a result of the rulemaking. ...
-
BENEFITS AND COSTS: SUMMARY
BENEFITS AND COSTS: SUMMARY Therefore, while establishing these requirements will result in significant costs to health care providers, establishing a lower adjustable height requirement...
-
V. Support Costs
"Support Costs" means only those incremental costs and expenses incurred by the City as a result of implementing or performing the terms of this Settlement Agreement which would not otherwise...
- Pilot Rock CN-R/R Round Receptacle Perforated Steel
- Pilot Rock CN-R/D Trash Receptacle
- Pilot Rock BPR2 Bear Resistant Trash and Recycling Receptacle
- Landscape Forms Inc. Chase Park Trash Receptacle
-
BENEFITS AND COSTS: OVERVIEW
BENEFITS AND COSTS: OVERVIEW Based on our analysis, we determined that transfer surface height requirements lower than 19 inches would increase the cost of designing and manufacturing...
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
-
Flange way gap
For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
-
7. Support Costs
Support Costs The City will only charge incremental costs that the City will incur as a result of implementing the program, which would not otherwise be incurred if the program did not...
- Pilot Rock BPR1 Bear Resistant Trash Receptacle
-
Summary of Costs and Benefits
We estimated the additional costs under three scenarios....
-
Standards Applicable Prior to March 15, 2012
use the 2010 Standards as adopted in the Title II regulations, except that Exception (1) in Section 206.2.3 does not apply, as an acceptable alternative accessibility standard for new construction...
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3