Several commenters requested that, where TDD-equipped pay phones or portable TDD’s exist, clear signage should be posted indicating the location of the TDD....
Search Results "Clear Floor Area"
Commonly Searched Documents
-
§35.163 Information and Signage
-
1005.3 Edge Protection
platform 12 inches (305 mm) where the 34 inch (865 mm) high railing is provided is an alternative design, permitting individuals using wheelchairs or other mobility devices to pull into a clear...
-
1005.3 Edge Protection
platform 12 inches (305 mm) where the 34 inch (865 mm) high railing is provided is an alternative design, permitting individuals using wheelchairs or other mobility devices to pull into a clear...
-
Platform Size and Surface
Platform Size and Surface To be part of an accessible route, lift platforms must provide the amount of clear space required for wheelchairs in ADAAG 4.2.4....
-
R402.3 Post-Mounted Objects
Where objects are mounted between posts or pylons and the clear distance between the posts or pylons is greater than 305mm (1.0 ft), the lowest edge of the object shall be 685 mm (2.25 ft...
-
11B-707.3 Operable parts
Unless a clear or correct key is provided, each operable part shall be able to be differentiated by sound or touch, without activation. Exceptions: 1....
- Crystal Sauna
- Arcadia's Arched Benches
- Sennheiser SZI 1015 2-Watt Radiator
- Hager Companies 36" Low Profile Actuator 2-659-0179 - Hard Wired
- Hager Companies 36" Low Profile Actuator 2-659-0178 - Wireless
-
Transfer Heights
that the majority of WMDs (92% of subjects in the first phase and the 5th percentile (or approximately 94% in this study) could transfer within one inch of the mean wheelchair seat to floor...
-
Shower Compartments
inch maximum curb in transfer-type showers in alterations to existing facilities, where recessing the compartment to achieve a ½-inch curb will disturb the structural reinforcement of the floor...
-
M301.4 Lift Compatibility
M01.4.1 Clearance in Base Proposed requirement: The base of the equipment shall provide a clearance 44 inches (1120 mm) wide minimum, 6 inches (150 mm) high minimum measured from the floor...
-
Section 307 Protruding Objects
This dryer protrudes more than 4" from the wall and is greater than 27" above the finish floor. Isn't this a violation of Section 307 Protruding Objects?...
-
11B-608.3 Grab bars
Where multiple grab bars are used, required horizontal grab bars shall be installed at the same height above the finish floor....
-
604.8.1.1 Size
shall be 60 inches (1525 mm) wide minimum measured perpendicular to the side wall, and 56 inches (1420 mm) deep minimum for wall hung water closets and 59 inches (1500 mm) deep minimum for floor...
-
604.8.1.1 Size
shall be 60 inches (1525 mm) wide minimum measured perpendicular to the side wall, and 56 inches (1420 mm) deep minimum for wall hung water closets and 59 inches (1500 mm) deep minimum for floor...
-
5.1 Transfer Surface Height Recommendations
5.1 Transfer Surface Height Recommendations Description: The transfer height is set above the finished floor surface to permit transfers form mobility devices onto the transfer surface...
-
Scenario 8 – Accessibility
Ayana, who is unable to walk upstairs due to her disability, is dismayed when she discovers that the art studio is on the second floor; she had planned to take an art class the following...
-
604.8.1.1 Size
shall be 60 inches (1525 mm) wide minimum measured perpendicular to the side wall, and 56 inches (1420 mm) deep minimum for wall hung water closets and 59 inches (1500 mm) deep minimum for floor...
-
11B-604.8.1.1 Size
shall be 60 inches (1524 mm) wide minimum measured perpendicular to the side wall, and 56 inches (1422 mm) deep minimum for wall hung water closets and 59 inches (1499 mm) deep minimum for floor...
-
11B-608.3 Grab bars
Where multiple grab bars are used, required horizontal grab bars shall be installed at the same height above the finish floor....
-
11B-608.3 Grab bars
Where multiple grab bars are used, required horizontal grab bars shall be installed at the same height above the finish floor....