Email us at info@calcasp.com Description How many times have we seen elements in the built environment installed and/or constructed incorrectly?...
Search Results "Construction Document"
- CalCasp Training: Access Plan Review
- Landscape Forms Inc. Presidio Trash Receptacle
- Landscape Forms Inc. Wellspring Trash Receptacle
-
Section 4. Application of the Guidelines
The design specifications (guidelines) presented in Section 5 apply to new construction of "covered multifamily dwellings", as defined in Section 2....
-
§ 36.401(d)(2)(ii)
(ii) A terminal, depot, or other station used for specified public transportation, or an airport passenger terminal. In such a facility, any area housing passenger services,...
-
Benches
Ensure that all benches provided along Forest Service trails or beach access routes or at Forest Service recreation sites (other than those inside a building or in an amphitheater)...
- Pilot Rock CN-R/R Round Receptacle Perforated Steel
- Pilot Rock CN-R/D Trash Receptacle
- Landscape Forms Inc. Chase Park Trash Receptacle
- Pilot Rock BPR2 Bear Resistant Trash and Recycling Receptacle
-
A4.17.3 Size and Arrangement
six or more toilet stalls are provided, it is therefore required that a 36 in (915 mm) wide stall with parallel grab bars be provided in addition to the standard stall required in new construction...
-
Education's Enforcement of DOJ's Title II Regulations
For new construction and alterations commenced on or after March 15, 2012, the 2010 Title II ADA Standards will be used by Education in its enforcement of the Title II regulations.[28]...
- Pilot Rock CN-OKR Oak Knoll Collection Trash Receptacle
- Pilot Rock BPR1 Bear Resistant Trash Receptacle
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3
- Bosch 3 Point Self Leveling Alignment Laser Level GPL 3 S
-
Document Formats
This document is available in the following formats for persons with disabilities -- Braille Large print Audiocassette Electronic file on computer disk and...
-
Flange way gap
For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
In the new construction of a new facility, all accessible rooms and spaces are required to be connected by an accessible route and all toilet facilities, drinking fountains, public telephones...
-
Standards Applicable Prior to March 15, 2012
use the 2010 Standards as adopted in the Title II regulations, except that Exception (1) in Section 206.2.3 does not apply, as an acceptable alternative accessibility standard for new construction...
- Magnuson Group UMEA Waste Receptacles
- Husky 10" Multi-Function Standard Digital Level
- Simple Pump Company ADA 100 Simple Water Pump