firmness and stability of surfaces with a portable device and performance specifications need to be accepted in order to enable land managers to determine whether the surface material on a trail...
Search Results "Trail Setting"
-
RECOMMENDATIONS
-
F245.1 General
This section contains the scoping requirements for picnic facilities, other than picnic facilities on trails....
-
7.4 Technical Provisions
General: Trails shall comply with 7.4....
-
4.7.6 Water Hydrant Clear Floor or Ground Space
Clear floor or ground space around a water hydrant shall be 48 inches (1220 mm) by 72 inches (1830 mm) with the long side of the space adjoining an outdoor recreation access route, trail...
-
4.4.4 Clear Floor or Ground Space
ground space of 36 inches (915 mm) by 48 inches (1220 mm) shall be located at an end the bench with one side of the space adjoining an accessible route, outdoor recreation access route, trail...
-
Section 37.42 Service in an integrated setting to passengers at intercity, commuter, and high-speed rail station platforms constructed or altered after February 1, 2012
Section 37.42 Service in an integrated setting to passengers at intercity, commuter, and high-speed rail station platforms constructed or altered after February 1, 2012....
- GameTime Sounds of Water Panel
-
5.3.6 Entrance
environmental conditions prohibit a level entry or the toilet design (such as a composting toilet) necessitates a raised toilet structure, a sloped entry complying with the FSTAG provisions for a trail...
-
5.3.6 Entrance
environmental conditions prohibit a level entry or the toilet design (such as a composting toilet) necessitates a raised toilet structure, a sloped entry complying with the FSTAG provisions for a trail...
-
Soiltac Powder Mix-In
Soiltac Powder Mix-In The trail segment is composed of the stabilizer, Soiltac Powder Mix-in, and is 5 feet wide by 30 feet long. The segment contains timber edging....
-
References
Anasazi Trails, Inc. (2008). Retrieved November 2011, from American Trails: http://www.americantrails.org/resources/trailbuilding/Rio-Grande-Trail-Surfacing.html Axelson, P....
-
Construction
Construction is building a new trail, recreation site, or facility where there was none before....
- Rockwood Manufacturing Company 11047 Series 47 Straight Single Bar Set 8" Pull CTC
-
Construction
Construction—The process of building a new trail, recreation site, or facility where there was none before....
-
Paper io – Draw, Defend, Dominate
Opponents can eliminate you by crossing your trail before you finish your loop. Every match is unpredictable and intense....
-
1019.1 General
Compliance would fundamentally alter the function or purpose of the facility or the setting. 4....
-
1019.1 General
Compliance would fundamentally alter the function or purpose of the facility or the setting. 4....
-
Limiting Factor
An extreme, uncorrectable environmental barrier that makes the trail beyond the barrier unreachable for many people with mobility limitations....
-
Limiting Factor
Limiting Factor—An extreme, uncorrectable environmental barrier that makes the trail beyond the barrier unreachable for people with mobility limitations....
-
7.4.11 Trailhead Signs
Where new trailhead information signs are provided at trailheads on newly constructed or altered trails, they shall comply with 7.4.11....
-
Provisions
The sections of accessibility guidelines and standards that explain what is required for specific situations and facilities (parking, picnic tables, trails, etc.)...
-
Provisions
The sections of accessibility guidelines and standards that explain what is required for specific situations and facilities (parking, picnic tables, trails, etc.)...
-
Technical Requirements
Are the specific numbers, conditions, and measurements that are required to be achieved (percent that must comply, dimensions, reach ranges, grades, trail width, etc.)....
-
5.1.4 Turning Space
Where the camp shelter floor is not elevated above the trail or ORAR, a turning space complying with ABAAS section 304.3 shall be provided....