least one outdoor recreation access route (ORAR) must connect the following at trailheads: Accessible parking spaces or other arrival points The starting point of the trail...
Search Results "Trail Setting"
Commonly Searched Documents
-
Outdoor Recreation Access Routes at Trailheads [F247.3.2]
-
5.1.1 General
Camp shelters located on trails shall be connected to other constructed features in the unit by a trail complying with the FSTAG....
-
5.1.1. General
Camp shelters located on trails shall be connected to other constructed features in the unit by a trail complying with the FSTAG....
-
Background
Background June 20, 2007, the Access Board issued proposed guidelines for outdoor developed areas that include requirements for newly constructed or altered trails....
-
SECTION#8
Lowell Caneday) at trailstudy@okstate.edu and email with Title: Photographs of the trail and surrounding environment, and attach to it trail’s photographs....
-
¼ Inch Minus Limestone
Quarter Inch Minus Limestone trail segment as second lift is rolled and compacted. August 9, 2007....
-
Acknowledgements
Acknowledgements The National Trail Surfaces Study has taken a number of turns over the past several years....
-
F246.1 General
This section contains the scoping requirements for viewing areas, other than viewing areas on trails. The scoping requirements for viewing areas on trails are contained in F247.4.3....
- Mayer-Rothschild Foundation: Determination of Grab Bar Specifications for Independent and Assisted Transfers in Residential Care Settings
-
Running Slope (Grade)
The ascent or descent of a trail segment expressed as a percentage of its length, which is the difference in elevation of a section of a trail measured parallel to the predominant direction...
-
5.1.2 Level or Sloped Entry
If the camp shelter is accessed from a trail, the sloped entry must comply with the FSTAG Trail provisions....
-
Selection of Participants
Selection of Participants The principal investigators at OSU were to pilot test the survey instruments with professional contacts in parks and recreation that manage pedestrian trails...
-
Soiltac Liquid Mix-In
Soiltac Liquid Mix-In trail segment is leveled. June 27, 2007. Soiltac Liquid Mix-In trail segment is prepared. June 27, 2007....
-
Cross Slope
Cross Slope—The percentage of rise to length when measuring the trail tread from edge to edge perpendicular to the direction of travel....
-
Section 37.42 Service in an integrated setting to passengers at intercity, commuter, and high-speed rail station platforms constructed or altered after February 1, 2012
Section 37.42 Service in an integrated setting to passengers at intercity, commuter, and high-speed rail station platforms constructed or altered after February 1, 2012....
-
Running Slope
Running Slope—The ascent or descent of a trail segment expressed as a percentage of its length....
-
RECOMMENDATIONS
firmness and stability of surfaces with a portable device and performance specifications need to be accepted in order to enable land managers to determine whether the surface material on a trail...
-
F245.1 General
This section contains the scoping requirements for picnic facilities, other than picnic facilities on trails....
-
4.7.6 Water Hydrant Clear Floor or Ground Space
Clear floor or ground space around a water hydrant shall be 48 inches (1220 mm) by 72 inches (1830 mm) with the long side of the space adjoining an outdoor recreation access route, trail...
-
4.4.4 Clear Floor or Ground Space
ground space of 36 inches (915 mm) by 48 inches (1220 mm) shall be located at an end the bench with one side of the space adjoining an accessible route, outdoor recreation access route, trail...
-
7.4 Technical Provisions
General: Trails shall comply with 7.4....
- GameTime Sounds of Water Panel
- Rockwood Manufacturing Company 11047 Series 47 Straight Single Bar Set 8" Pull CTC
-
References
Anasazi Trails, Inc. (2008). Retrieved November 2011, from American Trails: http://www.americantrails.org/resources/trailbuilding/Rio-Grande-Trail-Surfacing.html Axelson, P....