curb or barrier shall be provided that prevents the passage of a 4 inch (100 mm) diameter sphere, where any portion of the sphere is within 4 inches (100 mm) of the finish floor or ground surface...
Search Results "Fire-Building Surface"
-
405.9.2 Curb or Barrier
-
6.3 Minority Reports
6.3 Minority Reports Because the Advisory Committee did not achieve consensus on the recommendation for a minimum transfer surface height standard, U.S....
-
11B-809.12 Electrical receptacles, controls and switches
When the reach is over a kitchen work surface and base cabinet, the work surface shall be 36 inches (914 mm) maximum above the finish floor and 25 1/2 inches (650 mm) maximum in depth....
-
ACCESSIBLE
[DSA-AC & HCD 1-AC] A site, building, facility, or portion thereof that is approachable and usable by persons with disabilities in compliance with this code....
-
11B-202.3.3 Alteration of single elements
If alterations of single elements, when considered together, amount to an alteration of a room or space in a building or facility, the entire room or space shall be made accessible....
-
Sec. 469.057(a)
(a) The department periodically shall inform professional organizations and others, including persons with disabilities, architects, engineers, and other building professionals, of this...
-
Sec. 469.001(a)
(a) The intent of this chapter is to ensure that each building and facility subject to this chapter is accessible to and functional for persons with disabilities without causing the loss...
-
A9. Accessible Route
Does each access aisle connect to an accessible route from the parking area to the accessible building entrance? [ADA Stds 4.6.2] Yes _____ No _____...
-
4.1.6(1)(c)
(c) If alterations of single elements, when considered together, amount to an alteration of a room or space in a building or facility, the entire space shall be made accessible....
-
4.1.6(1)(a)
(a) No alteration shall be undertaken which decreases or has the effect of decreasing accessibility or usability of a building or facility below the requirements for new construction at...
-
4.1.3(8)(b)(ii)
(ii) If access is provided for pedestrians from a pedestrian tunnel or elevated walkway, one entrance to the building from each tunnel or walkway must be accessible....
-
Public Use
Public use may be provided at a building or facility that is privately or publicly owned....
-
PUBLIC USE
Public use may be provided at a building or facility that is privately or publicly owned....
-
APPENDIX A: Provisions of the Architectural Barriers Act Accessibility Standards (ABAAS)
That Are Referenced in the FSORAG Technical Provisions The ABAAS are available at http://www.access-board.gov/guidelines-andstandards/buildings-and-sites/about-the-aba-standards/...
-
STRUCTURAL FRAME
[DSA-AC] The columns and the girders, beams and trusses having direct connections to the columns and all other members that are essential to the stability of the building or facility as...
-
11B-202.3.3 Alteration of single elements
If alterations of single elements, when considered together, amount to an alteration of a room or space in a building or facility, the entire room or space shall be made accessible....
-
11B-202.3.3 Alteration of single elements
If alterations of single elements, when considered together, amount to an alteration of a room or space in a building or facility, the entire room or space shall be made accessible....
-
PEER REVIEW
[OSHPD 1, 1R, 2, 4 & 5] Peer review refers to the procedure contained in California Building Code Section 1617A.l.41....
-
STRUCTURAL FRAME
[DSA-AC] The columns and the girders, beams and trusses having direct connections to the columns and all other members that are essential to the stability of the building or facility as...
-
Structural Frame
The columns and the girders, beams, and trusses having direct connections to the columns and all other members that are essential to the stability of the building or facility as a whole....
-
206.5.1 Entrances
Each entrance to a building or facility required to comply with 206.4 shall have at least one door, doorway, or gate complying with 404....
-
M305.3 Standing Supports (Section-by-Section Analysis)
The Access Board sought public input in questions 39 and 40 in the MDE NPRM preamble on whether the cross section dimensions for gripping surfaces should be applied to standing supports...
-
Bonded Beach Path Installation
The two binder systems used to fabricate the beach path surface were an acrylic and polyvinyl acetate polymer emulsion, SoilSement (Midwest Industrial, Canton, Ohio), mixed 30%...
-
M301.4.2 Clearance Around Base (Section-by-Section Analysis)
The proposed rule required a minimum clearance of 6 inches high measured from the floor and 36 inches deep measured from the edge of the examination surface. NPRM, 77 FR at 6927....