All violations found in the first suit against a covered entity are considered to be the first violation, so that the maximum penalty that may be assessed in that suit is $50,000....
Search Results "Feasibility (Technical, Infeasible, Structural, Maximum Extent)"
Commonly Searched Documents
-
III-8.4000 Suit by the Attorney General
-
Required Means of Egress [IBC §1007.1 (2003), §1003.2.13 (2000)]
For example, a business occupancy with no more than 30 occupants and a maximum exit access travel distance of 75 feet is permitted to have a single means of egress....
- LaCantina Aluminum Slider System
- LaCantina Multi-slide Aluminum Sliding Door System
-
4.2 Stretchers
But with today’s stretcher design, meeting those standards is infeasible given current requirements for multipurpose stretcher functions within health care delivery settings....
-
703.3.1 Dimensions and Capitalization
Table 703.3.1 Braille Dimensions MEASUREMENT RANGE MINIMUM IN INCHES MAXIMUM IN INCHES Dot base diameter 0.059...
-
11B-1009.3.3 Handrails
The clear width between required handrails shall be 33 inches (838 mm) minimum and 38 inches (965 mm) maximum. Exceptions: 1. ...
-
703.3.1 Dimensions and Capitalization
Table 703.3.1 Braille Dimensions Measurement Range Minimum in Inches Maximum in Inches Dot base diameter 0.059 (1.5 mm) to 0.063 (1.6 mm)...
-
F228 Depositories, Vending Machines, Change Machines, and Mail Boxes
These elements are subject to requirements for operable parts in section 309, which specify location within accessible reach ranges and maximum operating forces....
-
Accessible Routes
The accessible route must comply with ADAAG provisions for the location, width (minimum of 36 inches), passing space, head room, surface, slope (maximum of 1:12 or 8.33%), changes in level...
-
Tax Credits and Deductions
The tax deduction is available to all businesses with a maximum deduction of $15,000 per year....
-
Parking Spaces [4.6.3]
A maximum slope of 2% is required in all directions for both the space and access aisle since level surfaces are important for wheelchair transfer to and from vehicles....
-
11B-704.4.1 Height
wheelchair accessible telephone because the required 34 inches (865 mm) minimum keypad height can causes the highest operable part of the telephone, usually the coin slot, to exceed the maximum...
-
11B-704.4.1 Height
wheelchair accessible telephone because the required 34 inches (865 mm) minimum keypad height can causes the highest operable part of the telephone, usually the coin slot, to exceed the maximum...
-
11B-703.7.2.6 Toilet and bathing facilities geometric symbols
Geometric symbols at entrances to toilet and bathing rooms shall be mounted at 58 inches (1473 mm) minimum and 60 inches (1524 mm) maximum above the finish floor or ground surface measured...
-
Expert Report of Ken Schoonover, P.E., KMS Associates, Inc. (August 7, 2018)
Sidewalks & Walkways: The cross slopes in the designated accessible routes exceed the maximum slope allowed of 1:48 (1991 ADA Stds 4.3.7; 2010 ADA Stds 403.3)....
-
Guidelines for Requirement 5
The Department has adopted the Option One guidelines for Requirement 5 with minor technical changes....
-
Triggering event
Two commenters expressed concern that the term “start of construction’’ is ambiguous, because it is unclear whether start of construction means the razing of structures on the site to make...
-
Triggering event. (Section-by-Section Analysis)
Two commenters expressed concern that the term "start of construction'' is ambiguous, because it is unclear whether start of construction means the razing of structures on the site to make...
-
5. BENEFITS DISCUSSION
The Department has no feasible way of projecting those figures. ...
- Populas Infinity Workstation
-
Accessible Surfaces Located In The Use Zone
The "use zone" is a ground level area beneath and immediately adjacent to a play structure or piece of equipment that is designated for unrestricted circulation around the equipment....
-
Accessible Boating Facilities
ADAAG addresses only the built environment (structures and grounds). The guidelines do not address operational issues of a facility....