The United States alleges that Joe Louis Arena is an existing facility originally constructed prior to the effective date of the ADA, and so is subject to the “readily achievable” barrier...
Search Results "Outdoor Constructed Feature"
-
I. BACKGROUND AND JURISDICTION
-
Salsbury Industries Designer Wood Locker
Requires the Registered User plan or above. Login!
- Bobrick ConturaSeries Surface-Mounted Sanitary Napkin Disposal B-270
- Seton ADA Braille Sign - Emergency Exit Only 89424
- Seton ADA Braille Signs - Exit 89426
-
Existing Facilities
The Board’s authority under the ADA only extends to the development and maintenance of accessibility guidelines for construction and planned alterations and additions....
-
2.3
agrees that, when Cinemark completes the modifications set forth in 3.1 through 3.11 of this Consent Order for each Modified Theater, and when Cinemark opens Designed Theaters and Future Construction...
-
b) Applicability
S/he is also not compelled to discover and correct conditions that were noncompliant at the time of construction, but were undetected. ...
-
Services and Facilities
The ADA sets requirements for new construction of and alterations to buildings and facilities, including health care facilities....
-
222 and 803 Dressing, Fitting, and Locker Rooms
commenters that the requirements in the 2010 Standards for the clear floor space to be beside the short axis of the bench in an accessible dressing, fitting, or locker room apply only to new construction...
-
Issue 5: Tactile arrow (in line)
Figure 12: In this new construction, APS is located too far from the sidewalk to be reached by a user of a wheelchair or scooter....
-
1121B.3.1, Item 12
SECTION 1121B - TRANSPORTATION FACILITIES 1121B.3 Fixed facilities and stations. 1121B.3.1 New construction. ...
-
1012.3 Opening limitations
In areas which are not open to the public within occupancies in Group I-3, F, H or S, balusters, horizontal intermediate rails or other construction shall not permit a sphere with a diameter...
-
1. Program Access Fund
The settlement shall include an annual commitment of $31 million per year for 30 years ($930 million), to be used for program access improvements and barrier removal, excluding new construction...
-
F206.2.4 Spaces and Elements
not be required to provide vertical access provided that the required clear floor space, maneuvering space, and, if appropriate, electrical service are installed at the time of initial construction...
-
206.2.4 Spaces and Elements
not be required to provide vertical access provided that the required clear floor space, maneuvering space, and, if appropriate, electrical service are installed at the time of initial construction...
-
Section 36.403 Alterations and Path of Travel (Section-by-Section Analysis)
Proposed § 36.403(a)(1) states that if a private entity has constructed or altered required elements of a path of travel in accordance with the 1991 Standards, the private entity is not...
-
221.2.2 Integration
Although not required under new construction standards, the regulations require that wheelchair users have access to specialty services and amenities available to other spectators....
-
1.9.1.5
. §19957) When buildings and facilities are constructed with state, county or municipal funds, or the funds of any political subdivision of the state, administrative authorities may grant...
-
Deferred Maintenance
Include the costs for any uncompleted work that is needed to bring a building into compliance with the provisions of ABA that were in force at the time of construction or major improvement...
-
Alterations [4.1.6(1)(f) & (k)]
In alterations, ADAAG does not require a level of access greater than that required in new construction....
-
A. GENERAL NONDISCRIMINATION REQUIREMENTS
Ensuring that facilities for which construction or alteration was begun after January 26, 1992, are readily accessible to and usable by people with disabilities, in accordance with the Title...
-
Slope and Rise [4.8.2]
Variation above regular construction tolerances can be disruptive to wheelchair travel, especially in the ascent direction....
-
II. Research Methodology
Therefore, a new database, which consisted of the names of all Recreational Trails Program administrators, was constructed based on a contact list with email addresses which was posted on...