For rail projects, no flange way gap can be greater than 2.5" where passenger circulation paths cross tracks at grade (i.e. a street-level pedestrian crossing over streetcar tracks)....
Search Results "New Construction"
Commonly Searched Documents
-
Flange way gap
-
§ 37.42(b)
(b) For new or altered stations serving commuter, intercity, or high-speed rail lines or systems, in which no track passing through the station and adjacent to platforms is shared with existing...
-
§ 37.42(b)
(b) For new or altered stations serving commuter, intercity, or high-speed rail lines or systems, in which no track passing through the station and adjacent to platforms is shared with existing...
-
§ 37.42(a)
requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry into final design or that begin construction...
-
§ 37.42(a)
requirements of sections 37.9 and 37.41, an operator of a commuter, intercity, or high-speed rail system must ensure, at stations that are approved for entry into final design or that begin construction...
-
7.4.10.1 Outdoor Constructed Features
Where provided within trailheads each outdoor constructed features such as parking spaces, toilets, or camp sites shall comply with the applicable portions of the FSORAG and ABAAS....
-
4 - Best practices for construction observation
4 - Best practices for construction observation Construction observation is the final step in building an accessible element to meet design and regulatory requirements....
-
Reconstruction
For the purposes of the FSORAG and FSTAG, actions are categorized as construction, alteration, or maintenance....
-
What do you call a reroute?
If trail work is grouped into only three categories— construction, alteration, and maintenance—what category do things like rerouting, reconstruction, and extensions of existing trails fall...
-
Standards Applicable Prior to March 15, 2012
construction and alterations that commence before March 15, 2012....
-
1011.1 General
All outdoor constructed features shall comply with 1011.2 and 1011.3....
-
4.1.3(5)*
In new construction if a building or facility is eligible for this exemption but a full passenger elevator is nonetheless planned, that elevator shall meet the requirements of 4.10 and shall...
-
Section 37.71 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating Fixed Route Systems
Section 37.71 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating Fixed Route Systems This section generally sets out the basic acquisition requirements for a public...
-
68.102(a) Compliance with the Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way
(a) For public right-of-way projects, in addition to accepting compliance with applicable TAS requirements, the department will also accept compliance with the Proposed Accessibility...
- Design Guidelines for the Visual Environment
- U. S. Department of Veterans Affairs Office of Construction & Facilities Management Technical Information Library (TIL)
-
Overview
This publication is designed to help title II and title III entities understand how new requirements for swimming pools, especially existing pools, apply to them....
-
Accessibility Standards in Title II Regulations Issued by DOJ
Among other things, they provide that new construction and alterations that commence on or after March 15, 2012, must comply with the 2010 Title II ADA Standards.[25] The revised Title...
- Trail Construction and Maintenance Notebook - 2007 Edition
-
Section 37.77 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating a Demand Responsive System for the General Public
Section 37.77 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating a Demand Responsive System for the General Public Section 224 of the ADA requires that a public entity...
-
Common Technical Requirements
The technical requirements for outdoor constructed features apply only to those outdoor constructed features that are required to comply with the technical requirements by the scoping requirements...
-
Title II Public Entity Facilities Compliance Timetable
New construction advertised for bid after this date must be readily accessible. (35.151(a)) 3.)...
-
1011.2 Clear Ground Space
A clear ground space complying with 1011.2 shall be provided at outdoor constructed features. EXCEPTIONS: 1. ...
-
1011.2 Clear Ground Space
A clear ground space complying with 1011.2 shall be provided at outdoor constructed features....