They therefore have a physical impairment that substantially limits one or more major life activities, including the functions of the immune system, which is a major bodily function....
Search Results "Barrier Management System"
-
TITLE III COVERAGE AND DETERMINATIONS
-
11B-240.2.1 Ground level play components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
Section 37.141 Requirements If a Joint Plan is Submitted
We recognize that the effort of putting together such a coordinated system can be a lengthy one....
-
11B-240.2.1 Ground level play components
A ramp or transfer system to the top of the slide is not required. Where a sand box is provided, an accessible route must connect to the border of the sand box....
-
TTY Use
Some opposed the requirement of a queuing system for TTY calls, claiming that such systems are in fact quite costly and that the expense is not justified given the low incidence and low...
-
Feature 3 - Building Entrance
ADA Standards for Accessible Design | Temporary Barrier Removal Suggestions for Accessible Features...
-
D. Resources
People with Disabilities,” a technical assistance document released by the Department of Justice in 2003 www.access-board.gov, the website of the Architectural and Transportation Barriers...
-
R201.1 Scope
applicable requirements in this document instead of the requirements in the Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities and the Architectural Barriers...
-
604.2 Location
This might allow a little more than the 18” maximum allowed by this section to be safe harbored for barrier removal projects and path of travel obligations under 202.4....
-
Section 1. Introduction
federal or federally-assisted program or activity from other requirements, such as those required by section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), or the Architectural Barriers...
-
PLANNING FOR SUCCESS
Training staff on the ADA, conducting periodic self-evaluations of the accessibility of the public entity's policies, programs and facilities, and developing a transition plan to remove barriers...
-
Problem
Cones or another temporary barrier may be needed to keep the parking space clear....
-
3. Private Property
., in a gated community or parking lot, mobile home community, business or government facility where vehicle access requires authorized passage through a security barrier)....
-
3. Private Property
., in a gated community or parking lot, mobile home community, business or government facility where vehicle access requires authorized passage through a security barrier)....
-
[2010 ADA Standards] 105.1 General
Copies of the referenced standards may be inspected at the Architectural and Transportation Barriers Compliance Board, 1331 F Street, NW, Suite 1000, Washington, DC 20004; at the Department...
-
Safe Harbors
Appendix to §36.304(d) Compliance Dates and Applicable Standards for Barrier Removal and Safe Harbor Date Requirement Applicable Standards...
-
Safe Harbors
Appendix to §36.304(d) Compliance Dates and Applicable Standards for Barrier Removal and Safe Harbor Date Requirement Applicable Standards...
- Guldmann GH3 Ceiling Lift - Horizontal Lifting
- Fuel Call
- Bradley Advocate AV-Series Model AV30 Lavatory, Soap & Hand Dryer Informational Video
-
SIDEWALKS
provide curb ramps or other sloped areas complying with the Standards or UFAS at all intersections of the streets, roads, and highways identified under this paragraph having curbs or other barriers...
-
Play areas. (Section-by-Section Analysis)
Thus, such family child care facility owners have no obligation to make similar changes for their existing facilities for purposes of barrier removal. ...
- The Independence Center - Colorado Springs, CO
-
1009.7.2 Separation
Exception: The fire-resistance rating and opening protectives are not required in the exterior wall where the building is equipped throughout with an automatic sprinkler system installed...