During construction inspection finish product thicknesses such as flooring materials or wall coverings must be considered when reviewing critical accessibility features, including but not...
Search Results "Input Floor"
Commonly Searched Documents
-
CALBO Accessibility Construction Inspection Checklist
-
1 - Design and drawing
Tolerances do not apply where a requirement states a range; for example, that grab bars must be installed between 33 inches and 36 inches above the finished floor....
-
11B-206.2.4 Spaces and elements
benches, clerks' stations, bailiffs' stations, deputy clerks' stations, and court reporters' stations shall not be required to provide vertical access provided that the required clear floor...
-
11B-206.2.4 Spaces and elements
benches, clerks' stations, bailiffs' stations, deputy clerks' stations, and court reporters' stations shall not be required to provide vertical access provided that the required clear floor...
-
11B-213.2 Toilet rooms and bathing rooms
shall not be required where a single unisex (single-user or family) toilet room or bathing room complying with Section 11B-213.2.1 is provided and located in the same area and on the same floor...
-
Section 4.1.3, Accessible Buildings: New Construction (Preamble, Section-by-Section Analysis)
Sections 4.1.3 (1) through (4) cover accessible routes, protruding objects, ground and floor surfaces, and stairs....
-
804 Kitchens and Kitchenettes
This is consistent with the proposed rule with respect to kitchens generally, but differs from proposed specifications for dwelling unit kitchens, which only addressed clear floor space...
-
I. INTRODUCTION
In addition, Northwest leases and operates healthcare provider services at the following properties: (1) the first floor of the Medical Office Building, West 2825 North State Road, Margate...
-
TABLE OF CONTENTS
Areas 241 Saunas and Steam Rooms 242 Swimming Pools, Wading Pools, and Spas 243 Shooting Facilities with Firing Positions CHAPTER 3: BUILDING BLOCKS 301 General 302 Floor...
-
Section 4.1.3, Accessible Buildings: New Construction (Section-By-Section Analysis and Response to Comments)
Sections 4.1.3 (1) through (4) cover accessible routes, protruding objects, ground and floor surfaces, and stairs....
-
Section 36.406(d) Social Service Center Establishments
In the NPRM, the Department expressed concern that the residential facilities standards do not include a requirement for clear floor space next to beds similar to the requirement in the...
-
M301.2.1 Transfer Surface Height
Figure 5.3-7: Elevated platform or possibly “full” floor concept (not to scale). This drawing illustrates the idea of raising the floor instead of lowering the table....
-
Pricilla Rogers, Ph.D. Making the “Invisible” World “Visible”
One of the pictures that’s in here [slide 11] is how we use, in the airport, design on the floor, the tactile, so that people would know where the gate was – people with visual impairments...
-
Section 36.406(d) Social Service Center Establishments (Section-by-Section Analysis)
In the NPRM, the Department expressed concern that the residential facilities standards do not include a requirement for clear floor space next to beds similar to the requirement in the...
-
Equipment and furniture. (Section-by-Section Analysis)
These groups recommended that the Department list by name certain types of medical equipment that must be accessible, including exam tables (that lower to 15 inches above the floor or lower...
-
Appendix Three: Bibliography
Space Requirements for Wheeled Mobility Devices in Public Transportation: Analysis of Clear Floor Space Requirements....
- American Standard Yorkville 1.6 gpf Right Height Elongated Pressure Assisted Toilet
- Symmetry Vertical Platform Lift VPC-SL
- AJW Architectural Products UG2-Railing UG2X-Y108 108" Concealed Snap Flange, 1.25" Diameter, Peened Grip - Configuration Y
- Mannington Mills Everywear III Collection Commercial Carpet
- AJW Architectural Products UG30-Railing UG30X-Y108 108" Concealed Set Screw Flange, 1.5" Diameter, Peened Grip - Configuration Y
- AJW Architectural Products UG3-A Series UG3-A12 12" Concealed Snap Flange, 1.5" Diameter Grab Bar - Configuration A
- AJW Architectural Products UG130-A Series UG130-A12 12" Exposed Flange, 1.5" Diameter Grab Bar - Configuration A
- AJW Architectural Products UG20-Railing UG20X-Y108 108" Concealed Set Screw Flange, 1.25" Diameter, Peened Grip - Configuration Y