An accessible route complying with Division 4 shall be provided to the ground- or floor-level entry points, where provided, of stairs, ladders, or other means of reaching the raised elements...
Search Results "Ground Surface"
Commonly Searched Documents
-
11B-203.11 Water slides
-
306.3.4 Clearance Reduction
Between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground, the knee clearance shall be permitted to reduce at a rate of 1 inch (25 mm) in depth for each 6 inches...
-
306.3.4 Clearance Reduction
Between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground, the knee clearance shall be permitted to reduce at a rate of 1 inch (25 mm) in depth for each 6 inches...
-
11B-203.11 Water slides
An accessible route complying with Division 4 shall be provided to the ground- or floor-level entry points, where provided, of stairs, ladders, or other means of reaching the raised elements...
-
11B-203.11 Water slides
An accessible route complying with Division 4 shall be provided to the ground- or floor-level entry points, where provided, of stairs, ladders, or other means of reaching the raised elements...
-
Background
the contaminant or force is removed, the surface returns to its original condition.”...
-
STORY
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
Ramp
Ramp: A ramped surface was designed to insert between two steps and serve as an integrated sliding board to assist with the transfers by bridging the gap between steps. ...
-
Why test on straight courses and P-shaped turning courses?
However, the cost for producing these course designs with a number of surface materials would be very large....
-
STORY
[DSA-AC] That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
ACCESSIBLE DWELLING UNITS
Requires the Accessibility Specialist plan or above. (Login or upgrade your account!)
-
Literature Cited
Standard specification for impact attenuation of surface systems under and around playground equipment, ASTM F1292....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
106.5.64 Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
11B-406.5.6 Grade breaks
Grade breaks shall not be permitted on the surface of ramp runs and turning spaces. Surface slopes that meet at grade breaks shall be flush....
-
11B-1009.5.4 Transfer steps
The surface of the bottom tread shall extend to a water depth of 18 inches (457 mm) minimum below the stationary water level. Advisory 11B-1009.5.4 Transfer steps....
-
Reduced scoping for play areas and other recreation facilities. (Section-by-Section Analysis)
The guidelines include requirements for ground-level and elevated play components, accessible routes connecting the components, accessible ground surfaces, and maintenance of those surfaces...
-
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
Attachment J: Access to Humboldt County Programs Housed in Others’ Facilities
-
308.2.1 Unobstructed
Where a forward reach is unobstructed, the high forward reach shall be 48 inches (1220 mm) maximum and the low forward reach shall be 15 inches (380 mm) minimum above the finish floor or ground...
-
Weather Shelters
Weather Shelters Course weather shelters must be designed and constructed to allow a golf car to enter and exit, and have a clear floor or ground space of 60 inches by 96 inches minimum...
-
Free-standing and Post-mounted Objects
Where objects are mounted above 27 inches from the ground or floor, overhangs are limited to 12 inches. This is based on standard measures for cane sweep....
-
F213.1 General
A pit toilet is a primitive outhouse consisting of a toilet riser over a hole dug into the ground or receptacle to receive and naturally decompose human waste....