Buffet meals can work for all audiences, though additional time may be required (versus seated/served meals)....
Search Results "Door Timing"
Commonly Searched Documents
-
Recommendations for Buffet Meals
-
§382.51(a)(6)
(6) You must enable captioning at all times on all televisions and other audio-visual displays that are capable of displaying captions and that are located in any portion of the terminal...
-
§8.56(h)(4)
(4) If neither party requests that the letter of findings be reviewed, the responsible civil rights official shall, within fourteen (14) calendar days of the expiration of the time period...
-
§ 37.139(c)(3)
of the available paratransit services in paragraphs (c)(2) and (c)(3) of this section as they relate to the service criteria described in §37.131 of this part of service area, response time...
-
§ 37.125(g)(3)
However, if the entity has not made a decision within 30 days of the completion of the appeal process, the entity shall provide paratransit service from that time until and unless a decision...
-
Section 37.109 Ferries and Other Passenger Vessels
Section 37.109 Ferries and Other Passenger Vessels Although at this time there are no specific requirements for vessels, ferries and other passenger vessels operated by private entities...
-
Section 37.95 Ferries and Other Passenger Vessels
Section 37.95 Ferries and Other Passenger Vessels Although at this time there are no specific requirements for vessels, ferries and other passenger vessels operated by public entities...
-
11B-705.1.2.2.2.2 Two entrance/exit points
Existing parallel curb ramps with detectable warnings in compliance with the code requirements in effect at the time of installation shall not be required to provide a minimum 36 inches...
-
FIGURE INDEX
Clear Width of an Accessible Route Figure 403.5.2 Clear Width at Turn Figure 404.2.3 Clear Width of Doorways Figure 404.2.4.1 Maneuvering Clearances at Manual Swinging Doors...
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage 2902-28
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage Stainless Steel 2902
- Bradley Aerix Hand Dryer Adjustable Speed Universal Voltage 2902
-
B. Effective Communication
Time for Assessment....
-
Safety Always Considered
At times, safety requires placing certain limitations on accommodations, e.g., a service animal cannot block the aisle or an exit....
-
Can platform lifts be locked?
Platform lifts can be locked during those times when the space or facility they serve is closed....
-
§ 37.59 Differences in accessibility completion dates
., extensions of different periods of time for a station which serves both rapid and commuter rail systems), accessibility to the following elements of the station shall be achieved by the...
- Rebuilding Together Montgomery County - Gaithersburg, MD
-
Single-User Toilet Rooms: No Side Transfer Space
Door clearances and turning space, as shown in the preceding examples, further determine minimum room dimensions....
-
11B-703.7.2.6.1 Men’s toilet and bathing facilities
The color of the triangle symbol shall contrast with the color of the door or surface on which the triangle symbol is mounted, either light on a dark background or dark on a light background...
-
DSA IR 11B-8 - USE OF PREDETERMINED CONSTRUCTION TOLERANCE GUIDELINES FOR ACCESSIBILITY (with revisions issued through Jan. 2011)
This IR is reviewed on a regular basis and is subject to revision at any time. Please check the DSA web site for currently effective IRs....
-
How Many People Are Necessary to Provide Assistance?
Common sense tells us that a specific person may not be available at any given time due to illness, vacation, an off-site meeting, and so on....
-
711.3.1 Through penetrations
fire-resistance rating; or The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E 119 time...
-
New Construction
Because ADA requirements for new construction and alterations do change from time to time, towns should become familiar with any new design and construction requirements before a project...
-
II. Research Methodology
When evaluating the firmness and stability of each of the 11 trail surface materials, how does each of the 11 trail surface materials compare to themselves over a 51 month time period?...