Information on planned availability of assistance in the use of or supervised operation of elevators and how to summon such assistance....
Search Results "Operation (Elevator)"
-
1007.11 Instructions
-
1003.2.13.5.4 Instructions
Information on planned availability of assistance in the use of stairs or supervised operation of elevators and how to summon such assistance. 4....
-
Are transportation operators required to retrofit their vehicles to accommodate larger and heavier wheelchairs?
No. 49 CFR Part 38 continues to require that lifts have a minimum design load of 600 pounds and the lift platform accommodates a wheelchair measuring 30 inches by 48...
-
Are transportation operators required to retrofit their vehicles to accommodate larger and heavier wheelchairs?
No. 49 CFR Part 38 continues to require that lifts have a minimum design load of 600 pounds and the lift platform accommodates a wheelchair measuring 30 inches by 48 inches.
-
§ 37.95 Ferries and other passenger vessels operated by public entities. [Reserved]
[See subsections ...]
-
§ 37.109 Ferries and other passenger vessels operated by private entities. [Reserved]
[See subsections ...]
-
11B-411.2.2.2 Verbal identification
When the accessibility function button is pressed, verbal announcement of the car designation shall be provided at the elevator car entrance upon arrival....
-
11B-411.2.2.2 Verbal identification
When the accessibility function button is pressed, verbal announcement of the car designation shall be provided at the elevator car entrance upon arrival....
-
Maximum side reach ranges. (Section-by-Section Analysis)
Commenters argued that the lowered height of operable controls can mean the difference between independence and dependence. ...
-
Section 37.71 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating Fixed Route Systems
Section 37.71 Purchase or Lease of New Non-Rail Vehicles by Public Entities Operating Fixed Route Systems This section generally sets out the basic acquisition requirements for a public...
-
11B-106.5 Defined terms
PLAY COMPONENT ELEVATOR, PASSENGER EMPLOYEE WORK AREA ENFORCING AGENCY ENTRANCE EQUIVALENT FACILITATION EXISTING BUILDING OR FACILITY EXIT FACILITY FUNCTIONAL...
-
11B-410.1 General
Platform lifts shall not be attendant-operated and shall provide unassisted entry and exit from the lift. [2010 ADAS] Advisory 410.1 General. ...
-
11B-410.1 General
Platform lifts shall not be attendant-operated and shall provide unassisted entry and exit from the lift. [2010 ADAS] Advisory 410.1 General....
-
11B-410.1 General
Platform lifts shall not be attendant-operated and shall provide unassisted entry and exit from the lift. Advisory 11B-410.1 General....
-
Door King Inc. 6004 Column Mount Swing Gate Operator Solar Powered
Requires the Registered User plan or above. Login!
-
STAIR
A change in elevation, consisting of one or more risers....
-
STAIR
A change in elevation, consisting of one or more risers....
-
11B-407.2.3 Hoistway signs
Signs at elevator hoistways shall comply with Section 11B-407.2.3....
-
11B-407.2.3 Hoistway signs
Signs at elevator hoistways shall comply with Section 11B-407.2.3....
-
11B-703.3.1 Dimensions and capitalization
When dealing with sign manufacturers or elevator companies whose scope of operations extends outside California, extra diligence is necessary to ensure that CBC braille specifications are...
-
11B-703.3.1 Dimensions and capitalization
When dealing with sign manufacturers or elevator companies whose scope of operations extends outside California, extra diligence is necessary to ensure that CBC braille specifications are...
-
11B-233.3.1.2.6.4 Test number three, unusual characteristics test
other similar requirements of law or code that require the lowest floor or the lowest structural member of the lowest floor be designed to a specified level at or above the base flood elevation...
-
11B-233.3.1.2.6.4 Test number three, unusual characteristics test
other similar requirements of law or code that require the lowest floor or the lowest structural member of the lowest floor be designed to a specified level at or above the base flood elevation...