Compliance with path of travel requirements is required to the maximum extent feasible without exceeding 20 percent of the cost of the work directly associated with the installation of EVCS...
Search Results "Cost Benefit Analysis"
Commonly Searched Documents
-
What occupancies are or are not subject to path of travel and/or accessible routes? …buildings subject to California Building Code (CBC) Chapter 11B? …multi-family buildings subject to CBC Chapter 11A? …others?
-
4. Benefits—Qualitative Discussion of Benefits
Although the anticipated benefits of this rulemaking are difficult to quantify, the Department remains convinced that there are significant qualitative benefits of this rulemaking that justify...
-
VI. Regulatory Process Matters (SBREFA, Regulatory Flexibility Act, Executive Orders, Benefits and Costs)
Regulatory Process Matters (SBREFA, Regulatory Flexibility Act, Executive Orders, Benefits and Costs) Since this proposal is an ANPRM, the Department is not required to conduct certain...
-
3. Costs—Summary of Likely Economic Impact
As a result, equipment acquisition and installation costs are incurred over the entire 15-year analysis period in the primary analysis....
-
Benefit Programs
Benefit Programs...
-
Why Design for Accessibility?
Why Design for Accessibility? I) It serves everyone who uses the facilities. A) Not just people with disabilities, but People carrying packages, People...
-
Afternoon Session: Consulting with Private and Public Entities
Afternoon Session: Consulting with Private and Public Entities James L.E. Terry, AIA, CASp Evan Terry Associates © 2014 Evan Terry Associates, P.C. This...
- 45 CFR Part 92 Nondiscrimination in Health Programs and Activities; Final Rule
-
When do path of travel and/or accessible routes apply? …new construction? …alterations to a parking area? …alterations to a building associated with parking, such as expansion or remodel?
Compliance is required to the maximum extent feasible without exceeding 20 percent of the cost of the work directly associated with the installation of EVCS (see Section 11B-202.4 Exception...
-
§ 35.151(b)(4)(iv)(B)
(B) In choosing which accessible elements to provide, priority should be given to those elements that will provide the greatest access, in the following order—
-
5. Costs of the Proposed Rule
percentage increase in recurring annual costs in later years....
-
Costs of Adaptation
A few commenters requested clarification on who incurs the cost of making a unit adaptable for a disabled tenant. Response....
-
Costs to Provide Accessible Pedestrian Signals and Pedestrian Pushbuttons (Section-by-Section Analysis)
Costs to Provide Accessible Pedestrian Signals and Pedestrian Pushbuttons (Section-by-Section Analysis) The Volpe Center estimated the additional cost for an accessible pedestrian pushbutton...
-
Are the elements of path of travel and accessible routes substantively the same (such as slope, vertical clearance, width of path of travel, etc.)?
Compliance is required to the maximum extent feasible without exceeding 20 percent of the cost of the work directly associated with the installation of EVCS (see Section 11B-202.4 Exception...
-
COST OF EQUIPMENT
COST OF EQUIPMENT Table 1: Cost of Equipment Configurations Dimensions Price Range Average Price Price Increase Configuration #1:...
-
202.4.1 Disproportionate Cost
202.4.1 Disproportionate Cost....
-
5.1 Costs Included
5.1 Costs Included: For the purposes of 11B-202.4, the adjusted construction cost for a project shall include: • All direct or "hard" costs directly associated with the contractor’s construction...
-
Costs to Provide Pedestrian Activated Signals at Roundabouts with Multi-Lane Pedestrian Street Crossings (Section-by-Section Analysis)
Costs to Provide Pedestrian Activated Signals at Roundabouts with Multi-Lane Pedestrian Street Crossings (Section-by-Section Analysis) The Volpe Center estimated the cost to provide pedestrian...
-
2.3. Upfront Costs
The acquisition costs, along with installation costs, are the upfront costs incurred by a movie theater as a result of the rulemaking. ...
-
4.1. Primary Analysis
This section shows the results for the primary analysis using 7-percent and 3-percent discount rates. ...
-
V. Support Costs
"Support Costs" means only those incremental costs and expenses incurred by the City as a result of implementing or performing the terms of this Settlement Agreement which would not otherwise...
-
1. Costs: Summary of Methodology and Results
For purposes of assessing the likely cost impact of these five requirements over the 12-year regulatory time horizon, the Final RA uses a unit cost approach that reflects both initial costs...
-
7. Support Costs
Support Costs The City will only charge incremental costs that the City will incur as a result of implementing the program, which would not otherwise be incurred if the program did not...
-
5.2 Cost Not Included:
5.2 Cost Not Included: The adjusted construction cost shall not include: • Project management fees and expenses. • Architectural and engineering fees....