Surfaces of clear spaces shall comply with R302.7 and shall have a running slope consistent with the grade of the adjacent pedestrian access route and cross slope of 2 percent maximum....
Search Results "Running Slope"
Commonly Searched Documents
-
R404.2 Surfaces
-
Cross Slope
Cross Slope. ...
-
11B-406.3.1 Slope
The running slope of the curb ramp segments shall be in-line with the direction of sidewalk travel. Ramp runs shall have a running slope not steeper than 1:12....
-
11B-406.3.1 Slope
The running slope of the curb ramp segments shall be in-line with the direction of sidewalk travel. Ramp runs shall have a running slope not steeper than 1:12....
-
11B-406.3.1 Slope
The running slope of the curb ramp segments shall be in-line with the direction of sidewalk travel. Ramp runs shall have a running slope not steeper than 1:12....
-
4.8.2* Slope and Rise
The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in (760 mm) (see Fig. 16)....
-
4.8.2* SLOPE AND RISE
The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in (760 mm) (see Fig. 16)....
-
11B-809.10.6.2 Slope
The slope of the shower floor shall be 1/2 inch (12.7 mm) per foot maximum in any direction and shall slope to a drain....
-
Slope [1013.3]
When the surface is constructed of materials other than asphalt, concrete, or boards, slopes no steeper than 1:20 (5 percent) are allowed when necessary for drainage....
-
1016.8.3 Slope
This section requires the slope of resting intervals to not be steeper than 1:48 in any direction....
-
1016.8.3 Slope
Resting intervals shall have slopes not steeper than 1:48 in any direction....
-
1016.8.3 Slope
Resting intervals shall have slopes not steeper than 1:48 in any direction....
-
1016.7.2 Cross Slope
The cross slope shall not be steeper than 1:48....
-
2.4.2 Cross Slope
The cross slope of an ORAR shall be no more than 1:33 (3 percent)....
-
1016.7.2 Cross Slope
The cross slope shall not be steeper than 1:48....
-
1014.2.1.1.2 Slope
The slope of the surface of the clear ground space shall not be steeper than 1:48 in any direction....
-
1014.2.1.1.2 Slope
The slope of the surface of the clear ground space shall not be steeper than 1:48 in any direction....
-
1016.7.2 Cross Slope
This section requires the cross slope of outdoor recreation access routes to not be steeper than 1:48....
-
1013.3 Slope
The slope of the surface of tent pads, tent platforms, and clear ground spaces shall not be steeper than 1:48 in any direction....
-
1013.3 Slope
The slope of the surface of tent pads, tent platforms, and clear ground spaces shall not be steeper than 1:48 in any direction....
-
5.1.8 Slope
The slope of the surface of the clear ground space shall not be steeper than 1:48 (2 percent) in any direction....
-
11B-504.4 Tread surface
Changes in level, slopes exceeding 1:48, and detectable warnings shall not be permitted. Exception: Reserved....
-
Rise [§405.6]
Rise [§405.6] The height of runs is limited (30” max.), but there is no limit on the number of runs a ramp may have....
-
11B-406.5.7 Cross slope
The cross slope of curb ramps and blended transitions shall be 1:48 maximum....