The Husky 24 in. Digital Laser Level features a laser diode located in the laser pulling head at the right of the level and can project a reference line along the wall. This level...
Search Results "Running Slope"
Commonly Searched Documents
- Husky 24" Line Generator Digital Laser Level
- 
    
  
  CROSS SLOPE
  CROSS SLOPE. The slope that is perpendicular to the direction of travel.... 
- 
    
  
  R302.6 Cross Slope
  R302.6 Cross Slope. Except as provided in R302.6.1 and R302.6.2, the cross slope of pedestrian access routes shall be 2 percent maximum. Advisory R302.6 Cross Slope.... 
- 
    
  
  Cross Slope
  Cross Slope The cross slopes of gangways, transition plates and floating piers that are part of an accessible route must be designed and constructed not to exceed a maximum of 2 percent... 
- 
    
  
  Cross Slope
  Cross Slope—The percentage of rise to length when measuring the trail tread from edge to edge perpendicular to the direction of travel.... 
- 
    
  
  1018.7.2 Cross Slope
  The cross slope shall not be steeper than 1:48.... 
- 
    
  
  1018.7.2 Cross Slope
  The cross slope shall not be steeper than 1:48.... 
- 
    
  
  CROSS SLOPE
  The slope that is perpendicular to the direction of travel.... 
- 
    
  
  CROSS SLOPE
  The slope that is perpendicular to the direction of travel.... 
- 
    
  
  1018.7.2 Cross Slope
  This section requires the cross slope of beach access routes to not be steeper than 1:48.... 
- 
    
  
  6.7.2 Cross Slope
  The cross slope of a beach access route shall be no more than 1:33 (3 percent).... 
- 
    
  
  1018.8.2 Slope
  This section requires the slope of resting intervals to not be steeper than 1:48 in any direction.... 
- 
    
  
  1011.2.3 Slope
  This section requires the slope of the clear ground space to not be steeper than 1:48 in any direction.... 
- 
    
  
  1011.2.3 Slope
  The slope of the clear ground space surface shall not be steeper than 1:48 in any direction.... 
- 
    
  
  1018.8.2 Slope
  Resting intervals shall have a slope not steeper than 1:48 in any direction.... 
- 
    
  
  1018.8.2 Slope
  Resting intervals shall have a slope not steeper than 1:48 in any direction.... 
- 
    
  
  1011.2.3 Slope
  The slope of the clear ground space surface shall not be steeper than 1:48 in any direction.... 
- 
    
  
  Cross Slope
  Cross Slope. The grade that is perpendicular to the direction of pedestrian travel.... 
- 
    
  
  1012.5 Slope
  This section requires the slope of the surface of parking spaces and pull-up spaces to not be steeper than 1:48 in any direction.... 
- 
    
  
  1.1.10 Ramps
  Measure accessible ramps for overall running slope and cross slope as well as local running slope and cross slope variations (flatness) in accordance with Sections 1.1.11, 1.1.12, 1.1.13... 
- 
    
  
  Slope
  The incline of a surface. 
- 
    
  
  Slope
  The incline of a surface. 
- 
    
  
  Gangway Slope and Rise Exceptions
  Gangway Slope and Rise Exceptions Gangways must be designed to provide for a maximum 1:12 (8.33%) slope but are not required to be longer than 30 feet in length.... 
